Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

North Booster Station Replacement
Renovation
Bidding
Normal, IL

Lift Station Rehabilitation PY20
New Construction
Bidding
Centreville, IL

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Check Valve Replacement
Results
Gurnee, IL 60031

Lift Station Upgrade
Results
$25,000 to $50,000 est. value
Greenup, IL 62428

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Lift Station Rehabilitation PY20
Renovation
Bidding
East Saint Louis, IL 62205

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Force Main Improvement - Lift Station 23 and 25A
Results
Edwardsville, IL 62025

LaGrange Road Sewer, Water Main Extension and Lift Station Post 20
New Construction, Infrastructure
Bidding
Tinley Park, IL 60477

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Oswego Pump Station Phase 2 Improvements
Results
Oswego, IL 60543

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Last Updated 11/29/2021 02:51 PM
Project Title

Stony Ridge Chlorine Booster Station

Physical Address View project details and contacts
City, State (County) Grayslake, IL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes installation of a prefabricated fiberglass shelter on a concrete pad to house a chemical feed system and related site, mechanical, and electrical work.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents