Similar Projects
2021 Water System Improvements And Fire Hydrant Replacements Project
Post-Bid
Less than $850,000 est. value
Littleton, CO 80127

2021 Capital Improvements Project South Cody Street
Alteration
Post-Bid
Lakewood, CO 80227

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Capital Improvements Project
Results
Lakewood, CO

Vidler Collection System Pipeline Replacement
Infrastructure
Post-Bid
Golden, CO

South Webster Street 12-Inch Water Main
Results
Lakewood, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

2020 Capital Improvement Program Project
Results
Less than $291,725 est. value
Lakewood, CO

Utility Locates
Results
CO

Morrison Road Hodgson Park Waterline Phase 2
Results
Lakewood, CO 80227

Jewell Street Bypass Sewer and 12-Inch Water Main
Results
Lakewood, CO

Lead Line Replacement Program
Results
Edgewater, CO 80214

Denver Water Capital Improvements Project
Results
Arvada, CO 20008

Prequalification Water Line Replacements
Term Contract
Results
Arvada, CO

West Mississippi Avenue 12 Waterline Project
Results
Less than $700,000 est. value
Lakewood, CO 80227

Last Updated 10/16/2021 04:44 AM
Project Title

20th Avenue Water System Improvements (Fenton Street to Depew Street)

Physical Address View project details and contacts
City, State (County) Lakewood, CO 80227   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The water system improvement project generally consists of installing an 8-inch PVC water main in 20th Avenue from Fenton Street to Depew Street which will interconnect the existing water mains in Fenton Street, Eaton Street and Depew Street. Bid Schedule A includes the improvements between Fenton St and Eaton St. Bid Schedule B includes all work from Fenton St to Depew St.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents