Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

9/11 Memorial Park
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Maroon Bell - Winchester Water Main Replacement
Infrastructure
Bidding
$2,360,000 CJ est. value
Chino Hills, CA 91709

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Asphalt Seal and Stripe - East Side
Infrastructure
Post-Bid
$300,000 CJ est. value
Victorville, CA 92395

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Stanfield Cutoff Restroom Site Preparations Project
Infrastructure
Results
$300,000 est. value
Big Bear Lake, CA

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Silver Peak Solar Project
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Adelanto, CA 92301

Dupont Avenue Pavement Rehabilitation - City of Ontario
Infrastructure
Conception
$195,000 CJ est. value
Ontario, CA 91761

Last Updated 07/26/2023 09:43 AM
Project Title

Destruction of Water Well Nos. 11,15,17, and 26 and Various Facility Appurtenances

Physical Address View project details and contacts
City, State (County) Ontario, CA 91762   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $541,575 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to, providing all labor, material, equipment, and services necessary to destroy Water Well Nos. 11, 15, 17, and 26 and Various Facility Appurtenances in accordance with the County of San Bernardino and California Department of Water Resources standards and demolish and dispose of the site as outlined in the technical specifications for OMUC Contract No. UT 1617-02. Project Type Bid Response Types Line Items Subcontractor Bid Bond General Attachment Type of Award Lump Sum Bid Valid 120 Calendar Days Liquidated Damages $1,000 for each and every calendar day beyond Completion of Work Date Project Duration 120 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 10/27/2022 11:00 AM (PDT) No substitution will be considered unless written request for approval has been received in accordance with the General Conditions. Such requests shall include the name of the material or equipment for proposed substitution including drawings, performance and test data, and other information necessary for an evaluation. A statement setting forth changes in other materials, equipment or other portions of the work including changes in the work prompted by the substitution shall be included. The burden of proof of the merit of the proposed substitution is upon the proposer. The City's decision of approval or disapproval of a proposed substitution shall be final. The bidder is solely responsible for "on time" submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an e bid confirmation number with a time stamp from the Bid Management System indicating that bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Cash, cashier's or certified check may be submitted in lieu of a bid bond. A personal or company check will not be accepted. This is a State Prevailing Wage Project. List all subcontractors being paid in excess of 1/2 of 1% of the total bid amount. Absent a named sub for any portion of the work, Bidder agrees he is qualified and will perform that portion of the work Bidders may not bid as a prime and also submit a bid as a subcontractor. It is the bidder's responsibility to become familiar with the contract documents in their entirety. All forms in the bid booklet must be properly completed to be deemed responsive. Award of contract will be made by City Council.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents