Similar Projects
Brinkmann Ranch Mixed-Use Development
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Frisco, TX 75035

17 Jack Carter Park Improvements - 32-P62 - City Of Plano
Infrastructure
Conception
$3,000,000 CJ est. value
Plano, TX 75023

A-Affordable Storage / Anna
New Construction, Infrastructure - 308,000 SF
Design
$4,000,000 CJ est. value
Anna, TX 75409

Everest Stone Showroom and Warehouse
New Construction, Infrastructure - 7,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75229

Rise at Legacy Hills Phase 1 Utilities
Infrastructure
Bidding
$900,000 CJ est. value
Celina, TX 75009

Rise at Legacy Hills Phase 1 Paving
Infrastructure
Bidding
$630,000 CJ est. value
Celina, TX 75009

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Sub-Bidding
$95,000,000 CJ est. value
McKinney, TX 75069

Legacy Frontier Apartments and Legacy Drive Extension
New Construction, Infrastructure - 247,579 SF
Sub-Bidding
$55,000,000 CJ est. value
Celina, TX 75078

Melissa North Elevated Storage Tank Site Improvements Project
Infrastructure
Post-Bid
Melissa, TX

Lift Station and Waste Water Treatment Plant Site Improvements to Serve Oxford Place Phase 1
Alteration
Post-Bid
McKinney, TX

Trinity Forest Spine Trail Phase 1 - Site Development
Results
Dallas, TX

Pump Repairs and Pumping Station Services
Results
$65,000 est. value
Allen, TX

Village 121 Site Work
New Construction
Construction
Plano, TX 75024

Popeyes / McKinney
New Construction, Infrastructure - 2,700 SF
Construction
$725,000 CJ est. value
McKinney, TX 75070

Spring Creek Parkway Mixed-Use Development / Plano
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Plano, TX 75074

Last Updated 08/29/2022 12:22 PM
Project Title

Maxwell Creek Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Sachse, TX 75048   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,101,700 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Report no= DG-18-10296 All bids shall be accompanied by an acceptable bid bond or cashiers check in an amount of five percent (5%) of the total bid. The bid guaranty is required by the CITY as evidence of good faith and as a guarantee that if awarded the contract, the BIDDER shall execute the Contract and furnish the required bonds and evidence of insurance within ten (10) days after receipt of the awarded contract. The successful bidder must furnish Performance Bond and Payment Bond, each in the amount of 100 percent (100%) of the contract price, from an approved Surety company holding a permit from the State of Texas to act as surety, and acceptable according to the latest list of companies holding Certificates of Authority from the Secretary of the Treasury of the United States, or another Surety acceptable to the City. Further information concerning this Bid may be obtained by email only from the City of Sachse Public Works Department: Jon Lara, Public Works Coordinator, jlara@cityofsachse.com or the assigned City Project Manager. The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: 1. Phased demolition of two existing pump station buildings and associated yard piping. 2. Construction and commissioning of new water distribution system pump station tied into existing ground storage tank piping and distribution system piping. Provide temporary pumping system and disinfect ground storage tanks and piping as required during construction. 3. New backup power generator. 4. Electrical work to provide power and control wiring to the new facilities. 5. Fencing modifications including new motorized sliding gate. 6. Concrete repair and driveway improvements at the new pump station.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents