Similar Projects
Annual Contract - Asbestos Abatement
Term Contract
Post-Bid
FL

Briarwood Stormwater Treatment Facility Water Testing
Post-Bid
Less than $25,000 est. value
Venice, FL

Contractual Services - Algae Harvesting and Biomass Reuse for Sustainable Nutrient Reduction
Alteration
Results
Less than $959,754 est. value

Contractual Services - Algae Harvesting and Biomass Reuse for Sustainable Nutrient Reduction
Alteration
Results
Less than $959,754 est. value

Environmental Services
Term Contract
Post-Bid
FL

Asbestos and Mold Remediation Services
Term Contract
Results
FL

Water and Sewer Laboratory Services Provider
Term Contract
Post-Bid
Vero Beach, FL

Mold Remediation
Renovation
Post-Bid
Hollywood, FL 33024

Environmental Water Testing Service for Leeward Air Ranch and Perry Spray Field
Post-Bid
Ocala, FL 34472

Environmental Water Testing Services for WTP, WRF #2 & WRF #3
Post-Bid
Ocala, FL

April Mold Remediation
Post-Bid
$35,000 est. value
Gainesville, FL 32641

Drinking Water and Wastewater Treatment Services at Hillsborough River State Park (HRSP)
Term Contract
Post-Bid
Thonotosassa, FL 33592

Mold Remediation
Renovation
Post-Bid
Hollywood, FL 33024

Mold Remediation
Renovation
Post-Bid
Hollywood, FL 33024

Mold Remediation
Renovation
Post-Bid
Hollywood, FL 33024

Last Updated 08/30/2022 12:10 PM
Project Title

Structure Demolition

Physical Address View project details and contacts
City, State (County) Bunnell, FL 32110   (Flagler County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Insurance Required No Bid Bond Required No Demolition and removal of all debris of a residential structure, pool and other accessory structures on the property Question End Date 8/30/2022 5:00 PM The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents