Similar Projects
Hollywood Boulevard Mixed Use
New Construction, Infrastructure - 290,712 SF
Design
$22,000,000 CJ est. value
Hollywood, FL 33020

Polk Street Apartments
New Construction, Infrastructure - 42,228 SF
Design
$8,000,000 CJ est. value
Hollywood, FL 33020

SW 10th Street Connector Transportation Systems Management and Operations
Infrastructure
Bidding
$36,170,926 CJ est. value
Deerfield Beach, FL 33442

SW 10th Street Connector Transportation Systems Management and Operations
Infrastructure
Bidding
$36,170,926 CJ est. value
Deerfield Beach, FL 33442

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

River Oaks Stormwater Improvements (P11868)
Infrastructure
Results
$22,093,982 CJ est. value
Fort Lauderdale, FL 33301

River Oaks Stormwater Improvements (P11868)
Infrastructure
Results
$22,093,982 CJ est. value
Fort Lauderdale, FL 33301

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Millennium Townhouses
New Construction, Infrastructure - 10,916 SF
Construction
$4,000,000 CJ est. value
Fort Lauderdale, FL 33305

RFQ - Redevelop the Existing East and West Buildings of the Fort Lauderdale Aquatic Complex
Demolition, New Construction, Infrastructure
Pending Verification
$70,900,000 CJ est. value
Fort Lauderdale, FL 33316

New River Central
New Construction, Infrastructure - 5,697 SF
Pending Verification
$125,000,000 CJ est. value
Fort Lauderdale, FL 33301

Waves Dania Beach Mixed-Use
New Construction, Infrastructure - 1,300,000 SF
Design
$200,000,000 CJ est. value
Dania Beach, FL 33004

11 Acre Parks and Recreation Site Development
Infrastructure
Post-Bid
Pompano Beach, FL

Tradewinds Park Educational Farm and Gardens
New Construction
Results
$8,500,000 est. value
Coconut Creek, FL 33066

Last Updated 11/21/2022 08:05 AM
Project Title

Reuse Distribution System - SICP and Markham Park (Phase III) - 5095PI - City of Sunrise

Physical Address View project details and contacts
City, State (County) Sunrise, FL 33345   (Broward County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $2,770,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project proposes the installation of approximately 15,000 linear feet of new reuse distribution system to Markham Park and beyond to Weston. The City of Sunrise began planning for irrigational reuse in 2010. This project provides 2 MGD distribution to reuse customers from the Sawgrass Treatment Facility. The City's initial modeling demonstrated about 96% offset credit could be received from reuse in this area. With passage of Senate Bill 444, utilities discharging treated wastewater through ocean outfalls will be required to reuse 60% of these flows by 2025. This legislation provides an opportunity for a utility to contract with another for implementation of reuse in that other utility's service area and qualify for the associated reuse credits by virtue of the investment. Reuse is strongly encouraged by the regulatory agencies (SFWMD and the FDEP) as an alternate water source. As of November 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents