Similar Projects
Theriot Terrace Apartments
New Construction - 2,460 SF
Design
$500,000 to $1,000,000 CJ est. value
Sterling Heights, MI 48312

Legacy Park at Green Oak
New Construction
Design
Brighton, MI 48116

Playground Build
Build-Out
Bidding
$140,000 est. value
Dearborn, MI

Playground Equipment - Lincoln Elementary
New Construction
Bidding
$200,000 est. value
Cadillac, MI 49601

Gun Lake Park Improvement Services
Post-Bid
Wayland, MI

2021 Tennis Court Reconstruction and Baseball Improvement
Post-Bid
Northville, MI 48168

Martin Park Splash Pad Design / Build
Results
Ferndale, MI 48220

Softball Complex Dugout Upgrades
Results
East Lansing, MI 48823

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

Ludington State Park - Big Sable Point Lighthouse Protection
New Construction
Bidding
$10,650,830 est. value
Ludington, MI 49431

Riverside Park Construction Phase 3 and 4
Post-Bid
Detroit, MI

Replace Contact Station and Toilet Shower Building Holland State Park - Lake MACATAWA Campground
Results
Holland, MI 49424

Dozier Park Site Improvement
New Construction
Bidding
$90,000 est. value
Inkster, MI 48141

Hart Plaza Renovations 2021
Post-Bid
Detroit, MI

Summit Indoor Track Surface Replacement
Results
Canton, MI

Reported 05/11/2022 12:00 AM
Project Title

Holt High School Tennis Court Resurfacing

Physical Address View project details and contacts
City, State (County) Holt, MI 48842   (Ingham County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work Included: 1. Wherever possible throughout the Contract Documents, the minimum acceptable quality of workmanship and materials has been defined by manufacturer's name and catalog number, reference to recognized industry and government standards, or description of required attributes and performance. 2. To ensure that the specified products are furnished and installed in accordance with design intent, procedures have been established for advance submittal of design data and for their review by the Architect/Engineer. 3. Make all submittals required by the Contract Documents, and revise and resubmit as necessary to establish compliance with the specified requirements. B. Related Work Described Elsewhere: Individual requirements for submittals are described in other pertinent Sections of these Specifications.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents