Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Oakmead, Redwood, And Outlet Mall Lift Station Upgrades - C66501923 - City Of Petaluma
Renovation
Conception
$1,800,000 est. value
Petaluma, CA 94952

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Diversion Facility Upgrades
Renovation
Design
$470,000 CJ est. value
Pacific House, CA 95726

Beale Fuel Hydrant Replacement
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Beale AFB, CA 95903

Channel Force Main Intertie
Infrastructure
Bidding
$16,000,000 CJ est. value
San Francisco, CA 94103

Utilities Water and Wastewater Generator Replacement Project
Renovation
Sub-Bidding
$231,000 CJ est. value
Morgan Hill, CA 95037

Switchgear Rehabilitation Project
Renovation
Sub-Bidding
$12,200,000 CJ est. value
Hayward, CA 94545

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

Walnut Avenue Pump Station
New Construction
Design
$880,000 est. value
Simi Valley, CA 93063

P-Site Road Repairs
Infrastructure
Bidding
$250,000 CJ est. value
Middletown, CA 95461

Last Updated 08/16/2022 01:01 PM
Project Title

Lift Station Upgrades - 909953000722 - City of Oceanside

Physical Address View project details and contacts
City, State (County) Oceanside, CA 92054   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $867,214 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Misc. improvements and upgrades to various sewer lift stations throughout the City. FY 2022-23 projects include a major renovation of Pilgrim Creek Lift Station and a repair to the channel crossing at North Valley Lift Station. Project is included in the City of Oceanside's FY 2022-2027 Budget CIP. As of August 16, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated from 2022 to 2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents