Similar Projects
SR 61 over Lick Run
Renovation, Infrastructure
Conception
Less than $910,000 est. value
Shamokin, PA 17872

SR 11 from SR 147 to C Street
Infrastructure
Conception
$1,100,000 est. value
Northumberland, PA 17857

SR 147 from Blacksmith Hill St to Toad Valley Road
Infrastructure
Design
Dalmatia, PA 17017

SR 147 (CSVT Gap) from Eighth St to SR 405
Infrastructure
Design
$1,730,000 CJ est. value
Northumberland, PA 17857

Construction of a Storage Building
New Construction, Infrastructure
Bidding
Milton, PA 17847

SR 4012 and SR 4005 Intersection Structure Removal
Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Snydertown, PA 17801

Cold Mix Contract
Infrastructure
Post-Bid
Elysburg, PA

Paving Project
Infrastructure
Post-Bid
PA

Roadway Paving Contract
Results
Elysburg, PA 17824

Fiber Coat Contract
Results
Elysburg, PA 17824

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Demolition of Blighted Structures
Demolition, Infrastructure
Post-Bid
$25,000 est. value
Shamokin, PA 17872

Reclamation and Seal Coat Contract
Results
Elysburg, PA

SR 3003 over Mouse Creek
Renovation, Infrastructure, Alteration
Conception
$340,000 est. value
PA

Last Updated 09/21/2022 11:52 AM
Project Title

Ada Ramps, Concrete Sidewalks and Concrete Curbing on S. Turbot Avenue, Columbia Avenue and Wall Street

Physical Address View project details and contacts
City, State (County) Milton, PA 17847   (Northumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 09/20/2022 at 12:00 PM ET ADA Ramps, Concrete Sidewalks, and Concrete Curbing The Work comprises the installation of six (6) ADA ramps, additional curbing and sidewalks, relocation of curbing and sidewalks and all appurtenances for a complete job in accordance with the Contract Documents, IBC, ICC, ICC NEC, and all applicable local, state, and federal codes.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents