Similar Projects
Sth 78 - Ush 14 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
Black Earth, WI 53515

Bristol-Main Mixed-Use Development
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Sun Prairie, WI 53590

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Braxton Pl Resurfacing and La Mariposa Lane (New Street)
Infrastructure
Design
$900,000 CJ est. value
Madison, WI 53715

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53715

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Portillos
Alteration
Post-Bid
Madison, WI 53719

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Pumping Stations No. 6 and No. 10 Variable Frequency Drive Upgrades
Renovation
Results
$200,000 est. value
Madison, WI 53714

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Walking Path Rock Removal
Infrastructure
Construction
$111,240 CJ est. value
Madison, WI 53715

Windsor Crossing
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Deforest, WI 53532

Belle Farm
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Middleton, WI 53562

Madison - Deforest Const / Replace Pavement Nb / PVRPLA
Infrastructure
Conception
$3,000,000 CJ est. value
McFarland, WI 53558

Last Updated 09/03/2022 09:32 AM
Project Title

Services at Well 5

Physical Address View project details and contacts
City, State (County) Fitchburg, WI 53711   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This work will generally consist of mobilizing to Well 5, pulling the pump (including cathodic protection and Aquastream), assessing the condition of all below ground equipment, televising the well, removing sand, developing the well, providing and reviewing written recommendation of equipment replacements and maintenance with Owner, providing all replacement equipment, installing all below ground equipment (including cathodic protection and Aquastream), testing, demobilizing, cleanup, providing submittals and O&M information, and for any other incidentals necessary to perform the work per the Standard Specifications.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents