Similar Projects
Excavation and Grading of the Aldine Westfield Storm Water Detention Basin
Infrastructure
Bidding
Houston, TX

Drainage and Road Improvements in the Castlewood Subdivision Sections 3 and 4, Precinct 2
Infrastructure
Bidding
Houston, TX

Proposed Clearing, Earth Movement, Construction of Proposed Lake Detention Basin, and Storm Sewer Systems Serving Anderson Lakes Development
Post-Bid
TX

Houston Ship Channel Placement Area 15 Improvements
Post-Bid
$5,000,000 to $10,000,000 est. value
Houston, TX 77002

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Club Creek Drive over HCFCD Unit D120-00-00 Under Bridge Riprap Rehabilitation
Results
Less than $161,200 est. value
Houston, TX 77002

Detention Pond and Administration Fence Replacement and Walkway Improvements
Infrastructure
Bidding
Less than $861,000 est. value
TX

South Main Street Drainage Improvements from West Texas Avenue to West Gulf Avenue
Post-Bid
Baytown, TX 77520

Drainage and Paving Facilities for City Gate Orem Drive Street Dedication
Results
Less than $477,146 est. value
Houston, TX

7th Street Paving and Drainage Improvements
Infrastructure
Bidding
La Porte, TX 77572

Green Valley Drive and Winningham Lane Roadway Drainage and Utility Improvements Project
Post-Bid
Houston, TX 77055

Construction of Water, Drainage, Paving and Traffic Signal in Greens Road Street Ded Section 3
Results
Houston, TX 77253

Balancing of Detention Basin Spoils, Existing Detention Basin Site Clean up and Hydromulch Seeding to Serve Traces Subdivision
Infrastructure
Bidding
TX

Water, Sanitary Sewer and Drainage Facilities to Serve Jasmine Heights Sections 18 and 19
Post-Bid
TX

Repair Rehabilitate Clodine Ditch, Buffalo Bayou and Tributaries Flood Control, Harris County, Texas
Results
$1,000,000 to $5,000,000 est. value
TX

Last Updated 06/09/2021 10:29 AM
Project Title

Drainage Improvements at Meadow Lake Tract A Subdivison for Harris County Precinct 1

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consist of the drainage improvements will include conveyance capacity of existing system to help with access/design (2-yr) rainfall events. Regrade all existing ditches and replace culverts with large size (24-inch minimum) to maximize conveyance where possible. Add cross culvert at southern boundary (Parkfield Road) to help equalize flow. Cut new Bioswale at northern boundary to drain east off property to Pineland Roadside ditch and connect with a 36” RCP under Pineland Road. The Bioswsale will be constructed as part of or as a separate project depending on right of way acquisition.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents