Similar Projects
Last Updated | 03/09/2023 03:35 PM |
Project Title | High School & Middle School Renovation Areas |
Physical Address | View project details and contacts |
City, State (County) | Dunlap, IA 51529 (Harrison County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $60,000 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Each Bidder shall accompany its Bid with Bid Security, as security that the successful Bidder will enter into a Contract for the work bid upon in accordance with the Contract Documents and statutory requirements. The Bidder's security shall be in an amount equal to 5% of the total amount of the Base Bid and shall be in the form cash; or a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond and shall be made payable to Boyer Valley Community School Board and the proceeds retained as penalty if the Bidder fails to execute a contract and file acceptable Performance and Payment Bonds or provide an acceptable Certificate of Insurance within 10 days after the acceptance of such proposal by resolution of the Board. D. Consideration of the Bids received and the award of the Contract or other action may be made by the Boyer Valley Community School District at a later date to be determined. E. Contract Documents may be examined at the office of the Architect, the High School Superintendents Office, the office of Boyd Jones Construction. Electronic contract documents are available from Boyd Jones Construction. Contact Ben Gordon - bgordon@boydjones.biz F. Work under the proposed Contract shall be commenced upon receipt of signed Contract and shall be completed in a timely manner by March 1, 2024. G. The School Board reserves the right to reject any and all proposals, re-advertise for new bids and to waive informalities that may be in the best interest of the Board. H. By virtue of statutory authority, a preference will be given to products and provisions grown and locally produced within the State of Iowa and to Iowa domestic labor. I. The successful Bidder will be required to furnish a Performance Bond, a separate Labor & Payment Bond, both in an amount equal to 100% of its Contract Price, and Insurance; said documents to be issued by a responsible Surety approved by the Board and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. J. Asbestos Abatement Specifications and General Requirements have been prepared by Atlas Technical Consultants, which are hereby made a part of this Notice and the proposed contract shall be executed to comply therein. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |