Similar Projects
Windle Lane Stormwater Pond
Post-Bid
Daytona Beach, FL 32100

Blue Springs (Bank Stabilization)
Post-Bid
$550,000 est. value
FL

Roadway Repair
Results
Less than $350,000 est. value
FL

Drainage Repair
Results
Less than $400,000 est. value

Sweetwater Hills Drainage Improvements
Results
Less than $200,000 est. value
Port Orange, FL 32129

Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
Results
$5,000,000 to $10,000,000 est. value
FL

Deltona High School - Bus Loop and Drainage Renovations
Results
Less than $123,789 est. value
Deltona, FL 32725

Design/Build H Matthew Waterfront Repair, STA Ponce De Leon Inlet, USCG Station New Smyrna Beach, FL
Results
$1,000,000 to $2,000,000 est. value
New Smyrna Beach, FL

Riverfront Park Seawall Replacement
Results
Less than $3,326,655 est. value
Daytona Beach, FL 32100

Flomich Street and Riverside Drive Storm Outfall Replacement
Results
Less than $150,000 est. value
Holly Hill, FL 32117

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Drainage Repair
Results
Less than $1,300,000 est. value
FL

Drainage Repair
Results
Less than $300,000 est. value
FL

49 Lantana Drive Drainage Improvements
Results
DeBary, FL

Corrugated Pipe
Results
Less than $10,140 est. value
Ormond Beach, FL 32174

Last Updated 12/17/2019 12:50 PM
Project Title

Bethune Point Shoreline Stabilization

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32100   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes Shoreline Restoration and is located at Bethune Point Wastewater Treatment Plant in Daytona Beach located in Volusia County Florida and consists of 700 LF of shoreline restoration. The existing Tri-Lock and Rip Rap materials have deteriorated from the effect of several storm events. The restoration area includes removal and replacement of 18,293 SF (700 LF) Tri-Lock material. Project magnitude is $300,000- $350,000.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents