Similar Projects
Install Central Energy Plant
New Construction - 4,750 SF
Design
$10,000,000 to $15,090,000 est. value
Fort Hood, TX 76544

Amistad Dam Power Plant Turbine Pit Repairs/Painting
Renovation
Post-Bid
Del Rio, TX 78840

Central Utility Plant Upgrades at McAllen High School Phase II
Post-Bid
$1,700,000 est. value
McAllen, TX 78501

Last Updated 10/05/2021 12:17 PM
Project Title

Replacement of Automactic Transfer Switches

Physical Address View project details and contacts
City, State (County) Del Rio, TX 78840   (Val Verde County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace Automatic Transfer Switches (one each from Motor Control Center 1, 2, 3 & 4) to meet the power plants operations, maintenance, and safety requirements. USIBWC requests that the Contractor provide pricing for the items listed below. 1. The Contractor shall replace and install two (2) Automatic Transfer Switches for MCC3 and MCC4. a. Two (2) 400A/480V/3Phase service entrance rating and dead front cover Utility to Utility Automatic Transfer Switch with Molded Breakers and with Over-Current Protection in existing Siemens Allis MCC 3&4, MARQ 21 Cabinet Section (DWH) 20” 20” 90”. b. New transfer switches shall be equal or equivalent to an EATON (ATC-900 Breaker Base Transfer Switch) or similar model subject to the approval of USIBWC. 2. The Contractor shall replace and install one (1) Automatic Transfer Switch for MCC1. a. One (1) 225A/480V/3Phase service entrance rating and dead front cover Utility to Utility Automatic Transfer Switch with Molded Breakers and with Over-Current Protection in existing Siemens Allis MCC 1, MARQ 21 Cabinet Section (DWH) 20” 20” 90”. b. New transfer switch shall be equal or equivalent to an EATON (ATC-900 Breaker Base Transfer Switch) or similar model subject to the approval of USIBWC. 3. The Contractor shall replace and install one (1) Automatic Transfer Switch for MCC2.

Details

Power Plant, Renovation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents