Similar Projects
Lead Water Service Line Replacements
Term Contract
Post-Bid
Newburgh, NY 12550

Water Hydrants, Pipe and Valves
Post-Bid
Jamestown, NY 14701

Shether Street Water Main Replacement Project
Results
Less than $280,000 est. value
Hammondsport, NY

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Hot Water Supply Repair
Post-Bid
Binghamton, NY 13904

Installation of Cone Valves at East Delaware Tunnel Outlet
Results
$721,650 to $976,350 est. value
Neversink, NY 12765

Consolidated Water District No. 1 Water System Repairs and Service Installations
Post-Bid
East Syracuse, NY 13057

Melody Lake Water District Watermain Replacement Project
Results
Thompson, NY 12834

Furnish and Install Various Sized Line Stops on Existing Cast Iron Water Distribution Pipes within the City on an As-Needed Basis (AS)
Term Contract
Post-Bid
Yonkers, NY 10701

Hyde Park Phase 2 Water Meter
Results
Poughkeepsie, NY

Bollier Avenue Water Main Replacement Project
Term Contract
Post-Bid
Niagara Falls, NY 14302

Chelsea Service Line Connections and Road Repaving
Results
Wappingers Falls, NY

On Call Line Stop Installations for City's Water Main System
Post-Bid
Yonkers, NY 10701

2019 Boyce Park and Dover Plains Library Water System Modifications
Results
Dover Plains, NY 12522

Purchase of Various Pipe Fittings, Piping, Manhole Riser Rings, Water Meters, Hydrant Markers and Fire Hydrants
Post-Bid
Niskayuna, NY 12309

Last Updated 10/21/2020 08:17 AM
Project Title

Witmer Road Meter Pit Rehabilitation

Physical Address View project details and contacts
City, State (County) Lockport, NY 14095   (Niagara County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Consist of the removal of the existing 16-inch piping, 16-inch turbine flow meter and strainer and the installation of new 16-inch DIP piping and new magnetic flow meter and connection of flow meter to the existing SCADA system

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents