Similar Projects
Waste Water Treatment Sewer Plant Line Upgrade
Infrastructure
Bidding
Hurricane, WV

Proposed Forcemain from Evans WWTP to Plaza Pump Station
Infrastructure
Bidding
Ripley, WV

Coalwood Sewer Project (Phase 1) Contract 1 - Wastewater Collection System
Post-Bid
Welch, WV

North Bend State Park Sewer Line Replacement
Post-Bid
South Charleston, WV

S--36C24519q0141 | Grease Trap Cleaning | Huntington WV VA
Results
Huntington, WV 25704

Close Caption Television Work (CCTV) for 60,000 Linear Feet of 8 Inch to 12 Inch Gravity Sewer Lines.
Results
Martinsburg, WV 25401

Meadowview Mobile Home Park Sewer Service Extension
Infrastructure
Bidding
WV

Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Sanitary Sewer Improvements
Results
Cameron, WV

Midway Pump Station Building
New Construction
Post-Bid
Bluefield, WV

Sewage Pumping Burnsville Lake
Results
Burnsville, WV

Frank-Bartow Sanitary Sewer Extension Project
Infrastructure
Post-Bid
Durbin, WV 26264

Panther Creek Elementary Septic Material Replacement
Results
Summersville, WV

Wildlife-Reeds Creek Hatchery Septic System Replacement
Infrastructure
Post-Bid
Franklin, WV

Inflow and Infiltration Rehabilitation
New Construction
Results
Charleston, WV

Last Updated 02/24/2022 04:00 PM
Project Title

Deer Valley Lift Station and Force Main Upgrade Project

Physical Address View project details and contacts
City, State (County) Scott Depot, WV   (Putnam County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Deer Valley Lift Station and Force Main Upgrade Project Contract No. 1 - Furnishing all materials, labor, and necessary items for the construction and installation of approximately 2,335 linear feet of 4" diameter sewer force main, 1,540 linear feet of 2" diameter sewer force main, 210 linear feet of 8" diameter gravity line, 20 linear feet of 6" diameter gravity main, 375 linear feet of 4" diameter directional bore, 2 manholes, 1 - 6" gravity sewer cleanout, 6 force-main cleanouts, one (1) lift station w/backup generator, one (1) duplex grinder pump station and other related appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents