Similar Projects
Central Fire Station New Roof Installation
Post-Bid
Uniontown, PA 15401

SCI Mercer - Replace Rubber Roofing
Post-Bid
$900,000 to $1,000,000 est. value
Mercer, PA 16137

Construction of a New Warehouse - Metal Roofing and Siding Construction
Results
North East, PA 16428

Partial Roof Replacement of the Keystone Middle/Senior High School
Results
Pittsburgh, PA 15216

Office Roof Replacement
Construction
Mill Hall, PA 17751

Daryl Kauffman: Agricultural Best Management Practices
New Construction - 2,816 SF
Post-Bid
Belleville, PA

Roof Replacement for Selected Middle School Roofs
Results
Pittsburgh, PA 15219

The Factory Ministries
Post-Bid
Paradise, PA 17562

Roof Replacement
Results
$100,000 to $200,000 est. value
York, PA 17406

Asphalt Shingle Roofs Replacement and Exterior Stairs Projects - General/Roofing Construction
Post-Bid
Wellsboro, PA 16901

Ebensburg Center - Replace Roofing
Results
$1,000,000 to $2,000,000 est. value
Ebensburg, PA 15931

Glen Lyon Roof Replacement Projects
Post-Bid
Glen Lyon, PA 18617

IDIQ Roofing Repair
Results
$10,000,000 to $25,000,000 est. value
Mechanicsburg, Philadelphia, PA

Roof Replacement on the Township Building
Post-Bid
Winfield, PA 17889

Acosta Volunteer Firehall Metal Roof Replacement
Results
Less than $24,900 est. value
Jenners, PA 15546

Reported 06/21/2022 12:00 AM
Project Title

Install a 50 Mil Duro-Last Roof

Physical Address View project details and contacts
City, State (County) Lykens, PA 17048   (Dauphin County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Labor and materials to install a 50 mil Duro-Last Roof in compliance with specifications of Duro-Last Roofing, Inc. at our Borough Building located at 200 Main Street, Lykens Pa. 17048. All existing Duro-Last Roofing will need to be removed down to iso board and eps. Iso board and eps will remain in place and act as underlayment for the new Duro-Last roof. All necessary stack flashing, wall flashing, curb flashings, vents, scuppers, down spouting and metal edging will need to be furnished and installed. There will need to be a warranty supplied by Duro-Last Roofing Inc. in place.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents