Similar Projects
Last Updated | 06/02/2023 05:07 PM |
Project Title | Hasenbank Stormwater Park |
Physical Address | View project details and contacts |
City, State (County) | Woodbury, MN 55129 (Washington County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,009,851 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to construct the Work. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; installing erosion control BMPs: silt fence, erosion control construction entrance, tree protection fencing; pedestrian traffic control; removal of existing vegetation; strip and salvage existing topsoil; removal of existing asphalt trail and base material; excavating and installing storm sewer piping; excavating, grading, and installing infiltration basins, underdrain piping, inline water level control structures, sand trenches, and bioretention soil; installing diversion structure and associated pipe connections to existing lake outlet; install bypass piping, screen, gate valve, and connection to pump station; install pump station, flow meter vault, force mains, power, and associated equipment, float valve; install force main discharge structure, gravity pipe, and transition structure; install park features to convey stormwater, including reinforced concrete bridge structures, stone blocks, corten steel panels; grading to build park overlook, install flagstone pavers, decorative boulders, concrete bench pads, and benches; install sheet pile wall; install gravel paths and bituminous trails; install decorative stone features, park entry sign with footings, bike racks and footings, and decorative boulders; backfill, grade, replace subsoil, replace topsoil, and restore all disturbed areas; finish grade, subsoil, temporarily seed, and install erosion control blanket; install and test pumps and controller; cleaning up site and removing all erosion control BMPs; all as provided for in the Bidding Documents. Questions will be accepted until 4:00 p.m., CST, Wednesday, May 24, 2023. Contact Information Barr Engineering Company Marcy Bean Project Manager 952-842-3511 mbean@barr.com Bid security shall be furnished in the amount of 5% of the bid in accordance with the Instructions to Bidders. Please contact us if you have any questions Est. Completion Date: June 30, 2024 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |