Similar Projects
Rolling Hills Sewer Extension
Infrastructure
Bidding
$500,000 CJ est. value
Elk River, MN 55330

Lakeview Knolls Pickleball
Infrastructure
Bidding
$2,000,000 CJ est. value
Maple Grove, MN 55369

Plumbing Services at PHA Scattered Sites
Term Contract
Sub-Bidding
Saint Paul, MN 55102

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

General Contractor for 1314 North 44th Avenue Piping
Alteration
Results
Minneapolis, MN 55412

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

2023 Sewer Rehabilitation Project
Infrastructure
Bidding
$316,000 CJ est. value
Mounds View, MN 55112

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Results
MN

2023 Water Meter Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Mounds View, MN 55112

Plumbing Services 2022
Alteration
Post-Bid
Saint Paul, MN

Olmsted County Justice Center Remodel - Mechanical and Plumbing Package
Alteration
Results
Rochester, MN 55904

Public Safety Facility Shower Refurbishment
Alteration
Post-Bid
$50,000 est. value
Minneapolis, MN 55415

Architectural/Engineering Services for Student Center & Library
Renovation, Infrastructure, Alteration - 8,995 SF
Results
$786,000 est. value
Saint Paul, MN 55106

Last Updated 06/02/2023 05:07 PM
Project Title

Hasenbank Stormwater Park

Physical Address View project details and contacts
City, State (County) Woodbury, MN 55129   (Washington County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,009,851 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to construct the Work. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; installing erosion control BMPs: silt fence, erosion control construction entrance, tree protection fencing; pedestrian traffic control; removal of existing vegetation; strip and salvage existing topsoil; removal of existing asphalt trail and base material; excavating and installing storm sewer piping; excavating, grading, and installing infiltration basins, underdrain piping, inline water level control structures, sand trenches, and bioretention soil; installing diversion structure and associated pipe connections to existing lake outlet; install bypass piping, screen, gate valve, and connection to pump station; install pump station, flow meter vault, force mains, power, and associated equipment, float valve; install force main discharge structure, gravity pipe, and transition structure; install park features to convey stormwater, including reinforced concrete bridge structures, stone blocks, corten steel panels; grading to build park overlook, install flagstone pavers, decorative boulders, concrete bench pads, and benches; install sheet pile wall; install gravel paths and bituminous trails; install decorative stone features, park entry sign with footings, bike racks and footings, and decorative boulders; backfill, grade, replace subsoil, replace topsoil, and restore all disturbed areas; finish grade, subsoil, temporarily seed, and install erosion control blanket; install and test pumps and controller; cleaning up site and removing all erosion control BMPs; all as provided for in the Bidding Documents. Questions will be accepted until 4:00 p.m., CST, Wednesday, May 24, 2023. Contact Information Barr Engineering Company Marcy Bean Project Manager 952-842-3511 mbean@barr.com Bid security shall be furnished in the amount of 5% of the bid in accordance with the Instructions to Bidders. Please contact us if you have any questions Est. Completion Date: June 30, 2024

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents