Similar Projects
RFQ Prequalification - New Bedford Public Schools Central Kitchen - Sub
Renovation - 15,869 SF
Bidding
$10,000,000 CJ est. value
New Bedford, MA 02740

Interior Campus Signs
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lowell, MA 01854

Bathtub Refinishing
Renovation
Sub-Bidding
$68,000 CJ est. value
New Bedford, MA 02740

Westwood Pool Deck Tile
Renovation
Post-Bid
$350,000 CJ est. value
Westwood, MA 02090

Countertop Replacements in Library. 3 Counters Approx 60 Feet
Alteration
Post-Bid
$20,000 est. value
Medway, MA 02053

Bathroom Tubs
Results
Less than $140,009 est. value
Brewster, MA 02631

Repaint & New Vinyl Stair Covers
Alteration
Results
$93,000 est. value
Framingham, MA 01702

Farr Alpaca Redevelopment / Appleton Mill - Finishing Trades
Build-out, Renovation
Construction
$35,000,000 CJ est. value
Holyoke, MA 01040

Provide Labor, Equipment, Materials and Tools to Remove and Replace
Renovation
Sub-Bidding
$450,000 CJ est. value
Boston, MA 02130

Basement Water Repairs
Alteration
Post-Bid
$11,500 est. value
Plymouth, MA

B27 Workforce Development/CNA Classroom Buildout - Sub bid
Renovation
Results
$730,246 CJ est. value
Springfield, MA 01103

Boston Day & Evening Academy and Rafael Hernandez School - Sub
Renovation
Sub-Bidding
$250,000 CJ est. value
Boston, MA 02121

Install Insulation Batting
Alteration
Post-Bid
$10,000 est. value
Franklin, MA

May Hall Stairs Repair
Alteration
Results
$200,000 est. value
Framingham, MA 01702

White Street School Renovations - SUB
Renovation
Sub-Bidding
$625,000 CJ est. value
Springfield, MA 01108

Last Updated 12/15/2023 08:33 AM
Project Title

Improving Ventilation and Air Quality

Physical Address View project details and contacts
City, State (County) West Tisbury, MA 02568   (Dukes County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of 56 existing windows and all demolition debris. Install 56 Adersen 400 Series double hung, double pane/low-e glass windows described below. Install new interior trim, expansion jambs, exterior trim and siding and remove all remaining construction debris. Window quantity and sizes as follows 15-TW2646 31 5/8" X 56 7/8", 32-TW21052 35 5/8" X 64 7/8", and 9-TW21056 35 5/8" X 68 7/8". All work will need to be coordinated to occur when school is not in session and work area must be secured when school is in session. Work cannot begin prior to approval of grant funds and no sooner than 4/1/2024. Work must be complete by 6/30/2025. All work is contingent of approval of grant application by Department of Elementary & Secondary Ed. MVPCS reserves the right to reject any and all bids when such rejection is in the best interest and/or if it, in its judgement, determines that a bidder(s) is not in a position to perform on the contract, MVPCS does not obligate itself to accept the lowest or any bid.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents