Similar Projects
Commercial Building
New Construction
Conception
Herriman, UT

The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Walmart Supercenter #6734-1 - LND-NEW
Renovation
Design
Herriman, UT 84096

Walmart Supercenter #5234-249 - SPRB-1
Renovation - 208,079 SF
Design
Clinton, UT 84015

Walmart Supercenter #1438-246 - SPRB-R
Renovation - 204,167 SF
Bidding by Invitation
Cedar City, UT 84720

Walmart Supercenter #4438-251 - SPRB-R
Renovation - 184,109 SF
Bidding by Invitation
Saratoga Springs, UT 84045

Golden Lucks Strip Center
New Construction - 11,912 SF
Sub-Bidding
Saratoga Springs, UT

Gateway Town Center - Pad 1A
New Construction - 6,998 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Payson, UT 84651

Walmart Supercenter #3620-236 - RM-1
Renovation - 204,337 SF
Post-Bid
Riverton, UT 84065

Smith's Food And Drug Centers #075-06
Renovation - 51,828 SF
Results
Payson, UT 84651

Pre-Construction and General Contracting Services through the Design and Construction Phases of The Nine Rails Arts Plaza on 25th Street
New Construction
Results
$1,450,000 to $2,400,000 est. value
Ogden, UT 84201

Lincoln Station
New Construction - 5,114 SF
Construction
Park City, UT 84098

Synergy Dance Studio
Renovation - 500 SF
Construction
West Jordan, UT 84081

Herriman Towne Center Mixed-Use
New Construction
Pending Verification
Herriman, UT

Go Wireless Verizon
Build-Out
Pending Verification
Saint George, UT

Last Updated 12/18/2020 12:15 PM
Project Title

O'Reilly Auto Parts #2974 (VER)

Physical Address View project details and contacts
City, State (County) Vernal, UT 84078   (Uintah County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Qualified Bidding.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Retail, 1 Story Above Grade, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents