Similar Projects
Last Updated | 04/25/2023 08:17 AM |
Project Title | Norwood Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Tualatin, OR 97062 (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,125,519 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall complete the work as specified or indicated in Owner's Contract Documents for the Project. The Project consists of work that is generally described as follows (collectively, Work): 1. Approximately 0.18-acres of clearing, grubbing, tree removal, and rough grading; 2. Procure and install a 7.5-horsepower submersible duplex pump station; 3. Procure and install pump station electrical, instrumentation, and control equipment (including a standby diesel generator and pump sequencing control panel); 4. Provide fencing and landscaping; 5. Procure and install a segmented block retaining wall; 6. Lay asphalt paving; 7. Install various site piping, both above-ground and underground; 8. Procure and install approximately 40-linear feet of 6-inch PVC forcemain (the remainder of the forcemain will be installed by others). The Work Site is located at the Norwood Pump Station near the intersection of SW Norwood Rd and SW Vermillion Drive, Tualatin, Oregon 97062 (Site). The Work is a public works project subject to ORS 279C.800 to 279C.870. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security as prescribed in the Instructions to Bidders. Bidders must deliver the original of the Bid security to Michelle Mann at Rock Creek Advanced Water Resource Recovery Facility (AWRRF), 3235 SW River Road, Hillsboro, Oregon 97123 within five business days after the Deadline or Owner may declare the Bid nonresponsive. The Successful Bidder will be required to furnish the additional bond(s) and insurance prescribed in the Bidding Documents. Prior to submission of its Bid, Bidder shall be registered with the Oregon Construction Contractors Board. The Work does not involve asbestos, so the requirements of ORS 468A.700 through 468A.760 shall not apply. Bidders must be qualified in accordance with the applicable parts of ORS 279C in order to submit a Bid for public work in Oregon. Owner reserves its right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |