Similar Projects
Reported | 10/30/2021 12:00 AM |
Project Title | Small Works Roster - Avenue NE Storm Repair - Phase One |
Physical Address | View project details and contacts |
City, State (County) | Arlington, WA 98223 (Snohomish County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the construction of approximately 390 feet of storm drainage collection and conveyance improvements on 77th Avenue NE and near 1034 Evergreen Point Road. Work includes, but is not limited to, the removal of 400 linear feet of existing storm drainpipe and associated catch basins, sawcutting and removal of asphalt concrete pavement, removal and replacement of 155 linear feet of concrete curb and gutter, excavation, and the installation of 8-inch, 12-inch, and 15-inch storm drainpipe and associated catch basins, miscellaneous surface restoration, traffic control, erosion control, utility conflict resolution. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |