Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

Mount St. Helens Spirit Lake Intake Headwall
Alteration
Bidding
$10,000,000 to $20,000,000 est. value
Cougar, WA 98616

US 97A/SR 971, Rock Slope Scaling
Infrastructure
Bidding
WA

Sewer Outfall Replacement
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Friday Harbor, WA 98250

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

SR 544, Unnamed Tributary To Fourmile Creek Fish Passage
Infrastructure
Bidding
WA

Eastrail North Segment Tie Removal and Interim Trail Phase 2
Infrastructure
Post-Bid
$1,280,212 est. value
Kirkland, Woodinville, WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

8th Street Improvements Project
Alteration
Bidding
$739,767 est. value
Marysville, WA

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Industrial Condensate Pipeline Outfall
Infrastructure
Bidding
$2,800,000 est. value
Lynden, WA

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Reported 10/30/2021 12:00 AM
Project Title

Small Works Roster - Avenue NE Storm Repair - Phase One

Physical Address View project details and contacts
City, State (County) Arlington, WA 98223   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 390 feet of storm drainage collection and conveyance improvements on 77th Avenue NE and near 1034 Evergreen Point Road. Work includes, but is not limited to, the removal of 400 linear feet of existing storm drainpipe and associated catch basins, sawcutting and removal of asphalt concrete pavement, removal and replacement of 155 linear feet of concrete curb and gutter, excavation, and the installation of 8-inch, 12-inch, and 15-inch storm drainpipe and associated catch basins, miscellaneous surface restoration, traffic control, erosion control, utility conflict resolution.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents