Similar Projects
Cooling Treatment Maintenance Services
Post-Bid
Jonesboro, Riverdale, GA 30236

HVAC Replacement and Related Work Parkview Extension Homes
Post-Bid
Athens, GA 30601

HVAC Services 2019
Term Contract
Results
Warner Robins, GA

Construction Management at Risk Services Watson Cooling Tower Replacement
Results
Less than $275,000 est. value
Statesboro, GA

Warren County HVAC
Construction
Warrenton, GA 30828

BCCCA HVAC and Lighting Replacement
Post-Bid
Cartersville, GA 30121

HVAC Filter Change-Out
Term Contract
Results
Adairsville, GA

Aubrey Street Recreational Gymnasium HVAC System
Post-Bid
Cartersville, GA 30120

New HVAC System for PE Facility
Results
Sandersville, GA

HVAC Renovations for South Douglas Elementary
Post-Bid
Less than $1,000,000 est. value
Douglasville, GA 30135

HVAC Services
Results
Norcross, GA 30071

HVAC Ingram Pye Elementary School
Post-Bid
Macon, GA 31204

Cedartown High School HVAC Modifications
Results
Cedartown, GA 30125

HVAC Maintenance Contract 2019-2021
Term Contract
Post-Bid
Waynesboro, GA

Commercial Kitchen Walk-In Freezer and Cooler Replacement
Results
Less than $229,500 est. value
Lawrenceville, GA 30046

Reported 04/17/2020 12:00 AM
Project Title

Construction HVAC and Roof Insulation

Physical Address View project details and contacts
City, State (County) Fort Benning, GA 31905   (Chattahoochee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13). The work to be performed will include, but not be limited to, the following principal features: design and replace PTAC units in smaller spaces, install new split system heat pumps in the locker and maintenance shop areas, extend existing walls to the roof deck to isolate each HVAC zone, and replace the sprayed foam insulation of the roof deck with vinyl wrapped blanket insulation for metal building systems. The electrical and plumbing work required is that necessary to accommodate the HVAC work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents