Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

2022 Resurfacing Program
Infrastructure
Bidding
$200,000 est. value
Youngstown, OH

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Reventment Bags and Erosion Control Mats
Results

Two Lane Resurfacing - SR 7-00.00 (Part 1 and Part 2)
Results
OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Robinhood, Red Grouse and Loch Heath Culverts Improvements
Results
$1,255,000 est. value
Boardman, OH 44512

Asphalt Replacement and Repair
Post-Bid
Youngstown, OH

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Concrete Pipes
Term Contract
Results

Commercial Asphalt Resurfacing and Striping Parking Lots
Infrastructure
Post-Bid
Sebring, OH 44672

Box Culverts
Term Contract
Results

Felger Road Safety Upgrades - Phase 2
Infrastructure
Post-Bid
$253,343 est. value
New Springfield, OH

Last Updated 04/26/2022 07:05 AM
Project Title

Wildwood and Ewing Storm Improvements

Physical Address View project details and contacts
City, State (County) Boardman, OH 44512   (Mahoning County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Paving/Reconstruction, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of two project areas. At the Wildwood Drive project area, the work includes dewatering the crossing, excavating the roadway approach to the crossing footing bottom, pouring a concrete plug along the outside edge of the footings and a crossing floor slab, backfilling and replacing the asphalt pavement, and replacing catch basins and storm sewer in the vicinity. At the Ewing Road project area, the work includes stream corridor enhancements (erosion protection, spillway & side channel, dam removal, dam modifications, and repair above the crossing). Also included is restoration to existing or better conditions. Project Location: The project is located at the crossing of Cranberry Run at Wildwood Drive and the crossing of Cranberry Run at Ewing Road in Boardman Township, Mahoning County, Ohio.

Details

Dam/Tunnel, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents