Similar Projects
Driveway Apron for Rainbow Lakes Substation
Bidding
Sumterville, FL

CDBG Repaving and Flood and Drainage Improvements
Results
Less than $566,054 est. value
Wildwood, FL 34785

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Sumter County Buena Vista Boulevard Phase 2 Rehabilitation from 300 Feet South of Lake Miona to North of C-44A Roundabout
Results
Wildwood, FL 34785

Sumter County Morse Boulevard Phase 2 from 1,000 Feet South of Stillwater Trail to SR 44
Results
Less than $3,066,768 est. value
Wildwood, FL 34785

Sumter County C-466A Eastbound From Canal Street to Morse Boulevard
Results
Less than $459,977 est. value
Wildwood, FL 34785

25th Street Crossing Improvement Project
Results
Less than $488,888 est. value
FL

Sumter County C-478 from US 301 to the City of Center Hill Southern Limits Resurfacing Project
Results
Less than $970,700 est. value
Wildwood, FL 34785

Sumter County C-478 Widening Between US 301 and SR 471
Results
Less than $4,498,933 est. value
FL

Walker Avenue, West Palm Avenue, and Jasper Street Overlay
Results
Less than $199,173 est. value
Bushnell, FL 33513

Resurfacing, Reconstruction, Widening
Results
Less than $2,025,463 est. value
FL

Emergency Roadside Assistance Services (I-75)
Results

Design Build Push Button Contract No. 2 – Program Management
Results

Asphalt Painting and Sealing - SECO HQ Building
Results
Sumterville, FL 33585

Emergency Roadway Repair
Results
Less than $1,000,000 est. value

Last Updated 01/28/2021 06:43 AM
Project Title

Resurfacing

Physical Address View project details and contacts
City, State (County) FL   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,526,534
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of milling & resurfacing, shoulder treatment, drainage improvements, flexible pavement reconstruction, curb & gutter and signing/pavement markings on SR 44. Section 0001 Roadway 0101- 1- Mobilization (44101415201) Ls 1.000 0102- 1- Maintenance Of Traffic (44101415201) Ls 1.000 0102- 60- Work Zone Sign Ed 14,035.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 20,650.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 380.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 828.000 0102-150- 1 Portable Regulatory, Sign Ed 800.000 0102-150- 2 Radar Speed Display Unit Ed 800.000 0102-909- Temporary Raised Rumble Strips- Per Day, Includes All Sets And Relocations Da 60.000 0104- 10- 3 Sediment Barrier Lf 1,281.000 0104- 18- Inlet Protection System Ea 50.000 0107- 1- Litter Removal Ac 1,070.490 0107- 2- Mowing Ac 963.280 0110- 1- 1 Clearing & Grubbing (44101415201) Ls 1.000 0110- 7- 1 Mailbox, f&i Single Ea 21.000 0120- 1- Regular Excavation Cy 766.500 0120- 6- Embankment Cy 467.400 0160- 4- Type b Stabilization Sy 4,384.000 0285-701- Optional Base, Base Group 01 Sy 433.000 0285-709- Optional Base, Base Group 09 Sy 1,351.000 0285-710- Optional Base, Base Group 10 Sy 1,005.000 0327- 70- 2 Milling Exist Asph Pavt, 3 1/2" Avg Depth Sy 1,311.000 0327- 70- 4 Milling Exist Asph Pavt, 3" Avg Depth Sy 240,206.000 0327- 70- 6 Milling Exist Asph Pavt, 1 1/2" Avg Depth Sy 15,758.000 0327- 70- 11 Milling Exist Asph Pavt, 2 1/4" Avg Depth Sy 43,584.000 0327- 70- 22 Milling Existing Asphalt Pavement, 4 1/4" Avg Depth Sy 35,153.000 0334- 1- 13 Superpave Asphaltic Conc, Traffic c Tn 40,959.500 0337- 7- 25 Asphalt Concrete Friction Course, Inc Bit, Fc-5, Pg 76-22 Tn 12,677.300 0337- 7- 83 Asphalt Concrete Friction Course,Traffic c, Fc-12.5, Pg 76-22 Tn 1,107.500 0339- 1- Miscellaneous Asphalt Pavement Tn 40.800 0425- 1-551 Inlets, Dt Bot, Type e, <10` Ea 1.000 0425- 2- 73 Manholes, j-7, Partial Ea 1.000 0425- 7- Manhole Cover- Replace Ea 1.000 0430-174-115 Pipe Culvert, Optional Material, Round, 15"Sd Lf 16.000 0430-174-118 Pipe Culvert, Optional Material, Round, 18"Sd Lf 28.000 0430-174-124 Pipe Culvert, Optional Material, Round, 24"Sd Lf 32.000 0430-984-123 Mitered End Section, Optional Round, 15" Sd Ea 1.000 0430-984-125 Mitered End Section, Optional Round, 18" Sd Ea 1.000 0430-984-129 Mitered End Section, Optional Round, 24" Sd Ea 1.000 0520- 1- 7 Concrete Curb & Gutter, Type e Lf 573.000 0570- 1- 2 Performance Turf, Sod Sy 44,479.000 0570- 1- 3 Performance Turf, Sod And Soil- Shoulder Treatment Index 570-010 Sy 23,540.000 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 91.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 75.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 3.000 0695- 1- 1 Traffic Monitoring Site Vehicle Sensor-Non-Weight, Furnish & Install Ea 4.000 0695- 6- 12 Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops Ea 4.000 0695- 7-162 Traffic Monitoring Site Cabinet, f&i, Type 3, 2 Pane Back, Pedestal Mount Ea 1.000 0695- 7-600 Traffic Monitoring Site Cabinet, Remove Existing Cabinet Ea 2.000 0710- 11-102 Painted Pavement Markings, Standard, White, Solid Forinterchange And Urban Island, 8" Gm 0.393 0710- 11-124 Painted Pavement Markings, Standard, White, Solid For Diagonal Or Chevron, 18" Lf 554.000 0999- 25- Initial Contingency Amount, Do Not Bid (44101415201) Ls 1.000 Section 0002 Signing 0546- 72- 3 Ground-In Rumble Strips, 8" Sinusoidal Gm 25.928 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 39.000 0700- 1- 12 Single Post Sign, f&i Ground Mount, 12-20 Sf As 22.000 0700- 1- 13 Single Post Sign, f&i Ground Mount, 21-30 Sf As 11.000 0700- 1- 60 Single Post Sign, Remove As 63.000 0705- 10- 1 Object Marker, Type 1 Ea 41.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 519.000 0710- 90- Painted Pavement Markings, Final Surface (44101415201) Ls 1.000 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" For Diagonals Nd Chevrons Lf 892.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 292.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 1.076 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 182.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 789.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6" Gm 1.402 0711- 15-101 Thermoplastic, Standard-Open Graded Asphalt Surfaces White, Solid, 6" Gm 18.114 0711- 15-102 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Solid, 8" Gm 0.583 0711- 15-131 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 15.099 0711- 15-201 Thermoplastic, Standard-Open Graded Asphalt Surfaces, Yellow, Solid, 6" Gm 14.868 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 0.903 0711- 16-102 Thermoplastic, Standard-Other Surfaces, White, Solid, 8" Gm 0.075 0711- 16-131 Thermoplastic, Standard-Other Surfaces, White, Skip, 6",10 -30 Skip Or 3-9 Lane Drop Gm 0.253 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" Gm 0.736 0711- 16-231 Thermoplastic, Standard-Other Surfaces, Yellow, Skip, 6" Gm 0.283

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents