Similar Projects
Bridge and Approaches - SH 156
Renovation
Design
$1,696,000 est. value
Ponca City, OK 74601

US 11 - Utilities
Infrastructure
Design
$1,859,044 CJ est. value
Ponca City, OK 74601

Resurface (Asphalt) I-35 from 1.0 Mile South of US-60 Extend North Near Tonkawa and Blackwell
Post-Bid
OK

Materials Bridge 93A
Infrastructure
Post-Bid
Newkirk, OK

Joint Seal/Repair
Infrastructure
Results

Bridge Water Proof Seal
New Construction, Infrastructure
Results

Tonkawa Street Improvements to Various Streets
Infrastructure
Post-Bid
$370,000 est. value
Tonkawa, OK

6th Street – Fresno Ave to Hartford Ave
Infrastructure
Results
Ponca City, OK

Drainage Improvements Project Joe Street, Phases 1 and 2
Infrastructure
Post-Bid
$300,000 CJ est. value
Ponca City, OK 74601

Bridge and Approaches County Road (NS-312): Over Sand Creek
New Construction, Infrastructure
Results
OK

Resurface (Asphalt) I-35
Infrastructure
Results
OK

Slabjacking and Subsealing Services
Infrastructure
Results

Resurface (Asphalt) US-77
Infrastructure
Results
OK

Bridge and Approaches - I-35
New Construction, Infrastructure
Results
OK

Bridge Rehabilitation - I-35
New Construction, Infrastructure
Results
OK

Last Updated 09/16/2022 06:08 AM
Project Title

Bridge Rehabilitation - US 60

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2024
Bids Due View project details and contacts
Estimated Value $3,759,812 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-60: Over the Chikaskia River Approx. 1.7 Mile East of Us-177 As of September 16, 2022, the project is in Design status. Anticipated letting month/year is April, 2024. Length : 0.100 Mi. OKDOT - Bridge Rehabilitation - US 60 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents