Similar Projects
New Jesup Highway Storage Facility
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Brunswick, GA 31520

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

T32-D5-Drainage Rehabilitation, Repair, Replacement and Miscellaneous Maintenance Services-SR 25 Glynn-Various-140008
Infrastructure
Bidding
$400,000 CJ est. value
Brunswick, GA 31523

T32-D5-Drainage Rehabilitation, Repair, Replacement and Miscellaneous Maintenance Services-SR 25 Glynn 30 Inch Pipe-140006
Infrastructure
Bidding
$400,000 CJ est. value
Brunswick, GA 31523

St. Simons Elementary School Phase 1 Site Work
Post-Bid
Brunswick, Saint Simons Island, GA 31525

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Design Services for Bicycle and Pedestrian Multi-Use Boardwalk Trail
Results
Brunswick, GA 31520

Pennick Road Construction Project 2021
Results
GA 31525

Canal Road Self-Storage Complex
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brunswick, GA 31525

Coley Electric Addition
Addition, Demolition, Infrastructure - 12,120 SF
Pending Verification
$2,000,000 CJ est. value
Brunswick, GA 31525

Capital Square - Roadway Extension
New Construction
Design
Brunswick, GA

Comprehensive Maintenance Services
Infrastructure
Post-Bid

Lanier - Gloucester Intersection Improvements
Results
Brunswick, GA 31520

Chapel Crossing Apartments
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Brunswick, GA 31525

Last Updated 10/25/2022 09:39 AM
Project Title

Tru by Hilton / Brunswick

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31523   (Glynn County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 25, 2022, this project is in permitting. A firm construction timeline has not been established.

Details

3 Stories Above Grade, 68,467 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents