Similar Projects
Last Updated | 04/27/2022 07:35 AM |
Project Title | Marlborough Pump Station and Northern Boulevard Pump Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Albany, NY (Albany County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes providing all labor, materials, machinery, tools, equipment and other means of construction to construct the new Marlborough Pump Station including a precast concrete wet well with two submersible pumps, a valve vault including check valves, manual isolation valves, and a magnetic flow meter. The pump station will also include a new control panel with connectivity to the City SCADA system. A new 3-phase electrical service, a manual transfer switch and generator receptacle with new control system will also be provided. The Northern Pump Station improvements include installation of a grinder in a pre-fabricated fiberglass manhole, including an internal overflow to bypass high flows around the grinder, new flow meter, new bypass connection and a new SCADA system connection to the existing SCADA system. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |