Similar Projects
HVAC Controller Replacement
Term Contract
Design
Offutt AFB, NE

OPS Wilson Focus Elementary Roof Top Unit Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Omaha, NE 68117

Reheat Superheater Replacement Unit 2 Boiler (Gerald Gentleman Station)
Renovation
Sub-Bidding
$500,000 CJ est. value
Sutherland, NE 69165

High School Gymnasium HVAC Replacement
Alteration
Post-Bid
Milford, NE 68405

Ir Heater Maintenance And Services
Term Contract
Post-Bid
Offutt Air Force Base, NE

Cooling Tower Repair B451 - Offutt AFB
Term Contract
Results
Offutt AFB, NE

West Cooling Tower Replacement
Alteration
Results
Louisville, NE

Arnold Heights Furnace Replacement - 2023
Renovation
Sub-Bidding
$70,000 CJ est. value
Lincoln, NE 68524

HVAC Upgrades Phase IV
Alteration
Post-Bid
De Witt, NE

Elementary Gymnasium HVAC Replacement
Alteration
Results
Louisville, NE 68037

B5096 HVAC Controls Upgrade - Offutt AFB
Term Contract
Sub-Bidding
Offutt AFB, NE 68113

AV Closet HVAC Central Community College Kearney Center
Alteration
Post-Bid
Kearney, NE 68845

Rohwer Elementary School Heat Pump Replacement
Alteration
Results
Omaha, NE

Heat Pump Removal and Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Lincoln, NE 68508

Westside High School Water Source Heat Pump Replacement Phase III
Alteration
Post-Bid
Omaha, NE 68114

Last Updated 04/18/2023 12:05 AM
Project Title

Power Plant Cooling Improvements

Physical Address View project details and contacts
City, State (County) Tecumseh, NE 68450   (Johnson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project has been Cancelled Power Plant Cooling Improvements include but not limited to the following: Removal and disposal of existing cooling radiator, existing cooling tower, existing plant piping, existing station power feeder cable, existing electrical panel boards, existing station power transformers (3 ea.), existing disconnects, existing pole mounted transformer, and miscellaneous appurtenances related to the removal of these items. The improvements also include installation of proposed two cell 2500 GPM crossflow cooling tower, two 16.2 MBH plate and frame heat exchangers, two 1250 GPM solids separators, two 1250 GPM end suction pumps, one 304 SS storage tank with a total volume of 6,200 gallons, electric unit heaters (3 ea.), fixed blade louvers (3 ea.), wall mount exhaust fans (2 ea.), floor drains, hose bibs, building interior water and sewer piping, various mechanical valves, meters, gauges, pipe hangers and supports, cooling process piping, 1MVA pad mounted transformer, switchboards, panelboards, motor control center, VFD's, transfer switches, conductors, grounding system, conduit, building power and lighting circuits, light fixtures, improvements to low and medium voltage power, controls, 30'x32'x14' PEMB, building footings and concrete floor, personnel doorways, 10'x10' insulated coil door, wall and roof batt insulation, painting, concrete at perimeter of PEMB, structural support system and maintenance platform for elevated cooling tower, and all materials, equipment, and labor required for a complete and operational power plant cooling improvement project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents