Similar Projects
2022 Lakeside Park Trail/Boardwalk Project
Infrastructure
Bidding
Fond du Lac, WI 54935

2021 Lead Service Line
Post-Bid
Fond du Lac, WI

Licensed Plumbers/Utility Contractors interested in Participating in the Private Lead Service Line Program
Infrastructure, Alteration
Post-Bid
Ripon, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

STH 23 Utility Relocation
Results
Less than $750,000 est. value
Fond du Lac, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Newton Avenue and Rock Avenue Reconstruction - Phase 1
Results
Waupun, WI 53963

2022 Stormwater Improvements Moraine Park Technical College
Infrastructure
Post-Bid
Fond du Lac, WI

2021 Street and Utility Construction
Results
Fond du Lac, WI

2021 Sidewalk Management Program
Results
Fond du Lac, WI

Fox Ridge Business Park - Phase 3
Results
Fond du Lac, WI

Sanitary Sewer Relocation
Results
Fond du Lac, WI

Vermont Street and Parkway Terrace Reconstruction
Results
Ripon, WI 54971

County Highway Y (New Cassel Street) Reconstruction
Results
Campbellsport, WI 53010

2021 Sanitary Lateral Rehabilitation Program
Infrastructure
Results
Fond du Lac, WI

Last Updated 03/22/2022 04:30 PM
Project Title

2022 14th Street Reonstruction

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

4,400 LF 8-Inch and 6-Inch Sanitary Sewer Main and Lateral Reconstruction, 3,600 LF 24-Inch to 6-Inch Storm Sewer Main and Lateral Reconstruction, 2,300 LF 8-Inch and 6-Inch Water Main Reconstruction, 2,200 LF Polyethylene Water Service Pipe, 25,000 SF 6-Inch and 4-Inch Concrete Sidewalk and Driveway Approach, 4,100 LF Concrete Curb and Gutter Street Light Installation with Conduit and Wiring, 1,650 SY Lawn Restoration, 7,200 CY Common Excavation Includes Asphalt and Concrete Pavement Removal, 8,700 SY Crushed Aggregate Base Course 7,100 SY Concrete Pavement and/or Asphalt Pavement

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents