Similar Projects
Fasb Data Room Ac Replacement
Renovation
Sub-Bidding
$270,000 CJ est. value
Salt Lake City, UT 84112

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

DFCM Construction-Pre Qualified Mechanical-Udot Rampton MTF Building AHU and Unit Heaters
Alteration
Results
$771,000 est. value
West Valley City, UT 84119

Copper Hills High School Cooling Tower Modifications
Term Contract
Results
West Jordan, UT 84081

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

Fire Station 62 HVAC Replacement
Alteration
Results
South Jordan, UT 84095

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

U Hosp Infill Ll1 - HVAC Demo and Install New Equipment
Alteration
Results
$506,921 est. value
Salt Lake City, UT 84113

BEH S 025 AHU 1 System Upgrade
Alteration
Post-Bid
$190,217 est. value
Salt Lake City, UT 84112

Dfcm Construction-Pre Qualified Mechanical-Matheson Courthouse HVAC Upgrade
Alteration
Results
$1,300,000 est. value
Salt Lake City, UT 84111

Install Rooftop HVAC Units
Alteration
Post-Bid
Riverton, UT

ADC Heat Exchanger Replacements
Renovation
Results
$323,315 CJ est. value
South Salt Lake, UT 84119

4200 Pump Station Air Conditioning
Alteration
Post-Bid
Riverton, UT 84096

Hunter High School HVAC Upgrade
Alteration
Results
$200,000 est. value
West Valley City, UT 84120

Last Updated 05/11/2023 01:05 PM
Project Title

Rooftop Unit Replacement

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $83,665 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Q & A deadline: Mar 24, 2023 6:00:00 PM EDT The work to be done under this section includes the furnishing of all labor, materials, equipment, controls and accessories required to complete all heating, air conditioning, ventilating, plumbing, drainage, heat recovery, and other mechanical systems as shown on plans and/or described in these specifications, including miscellaneous items required to provide a complete and functional facility. B. Work shall include, but shall not be necessarily limited to, the following: 1. Testing 2. Balancing 3. Air distribution system 4. Automatic control systems 5. Air conditioning system 6. Plumbing systems 7. Roofing systems and flashings 8. Roof safety rail systems 9. Special systems C. The mechanical contractor shall provide all miscellaneous electrical work and control wiring for special systems where the wiring requirements are provided by the equipment manufacturers and/or suppliers, unless all of the required wiring is clearly shown on the electrical drawings to be provided by the electrical contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents