Similar Projects
Alabama A&M University Thomas Wing at Carver Complex HVAC Renovation
Alteration
Bidding
Huntsville, AL

WJ Carroll Intermediate School Chiller Upgrade
Alteration
Bidding
Bay Minette, AL

HVAC Condenser Unit Relocation at the HABD Elyton Village Housing Community
Post-Bid
Birmingham, AL 35233

Cullman County Courthouse HVAC Replacement
Post-Bid
Cullman, AL 35055

Marine AC Unit 30,000 BTU
Results
Huntsville, AL 35899

Causey Middle School Chiller Change - Out
Results
Mobile, AL 36695

HVAC Water Treatment Services
Term Contract
Bidding
Birmingham, Center Point, AL 35203

Cleaning of Hoods and Vents
Post-Bid
Birmingham, AL 35294

HVAC Improvements to Sandridge Student Center for Athens State University
Results
Less than $175,000 est. value
Athens, AL 35611

Alabama Supercomputer Center HVAC Systems Replacement
Alteration
Bidding
Huntsville, AL 35806

Henry Peters, 4th Floor, Air Handler Replacement
Post-Bid
$215,000 to $255,000 est. value
Birmingham, AL 35233

FMTC Building 1022 HVAC Maintenance and Repair
Results
Less than $1,500,000 est. value
Anniston, AL

Sparkman High School Cooling Towers Replacement
Bidding
Harvest, Huntsville, AL 35749

Replacement of the Chiller at the Courthouse
Post-Bid
Dothan, AL 36303

New HVAC Systems for Competition and Auxiliary Gymnasium And New Weight Room for Oneonta High School Package B - New Weight Room, Band Room and Classroom
Results
Oneonta, AL

Last Updated 05/20/2021 04:00 PM
Project Title

J041-- Install Mini Splits Bldg 3 2nd Floor (Va-21-00044119)

Physical Address View project details and contacts
City, State (County) Tuskegee, AL   (Macon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide adequate cooling for BLDG 3- 2nd floor rooms: 211, 219, 220, 203, 204, 206 and 210. AC sizes have not been determined; field verification of equipment size is required. Work includes furnishing and installing new Dakin or equivalent wall mounted AC splits to be controlled by wired thermostat. Systems should be cooling only with low ambient wind baffles. Work shall also include installation of new refrigerant and condensate piping, coring holes in exterior wall for piping and conduit. All holes should be sealed upon completion of work. Condensate drains on the exterior will be PVC. Install PVC covers over vertical line sets on the exterior of the building to conceal the refrigerant piping for each unit. Install communication wiring between the condensing units and the interior units. Tie-in the system to the refrigerant piping and charge with refrigerant. Start-Up the newly installed system to verify correct functionally. Clean up job site and provide all O&M documentation to the COR.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents