Similar Projects
Roeville Elevated Water Tank - City of Milton
Infrastructure
Conception
$500,000 CJ est. value
Milton, FL 32570

Highway 87 South Forcemain - City of Milton
Infrastructure
Conception
$300,000 CJ est. value
Milton, FL 32570

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Milton Downtown Waterfront Marina, Residential and Mixed-Use Development Opportunity
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Milton, FL 32570

Bagdad Mill Site Park Pavilion & Dock
Infrastructure
Bidding
$2,348,000 CJ est. value
Bagdad, FL 32530

RFP Engineering - Multilane Design SR 30 (US 98) in Santa Rosa County
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Gulf Breeze, FL 32563

RFP Engineering - Multilane Design SR 30 (US 98) in Santa Rosa County
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Gulf Breeze, FL 32563

Silicone Joint Sealer
Infrastructure
Results

Tiger Point Reclamation and Waste Water Treatment Facility Expansion
Infrastructure
Results
$56,984,000 CJ est. value
Gulf Breeze, FL 32563

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bridge Repair/Rehabilitation
Infrastructure
Construction
$278,513 CJ est. value
Milton, FL 32583

Tiger Point School - Santa Rosa County School District
New Construction, Infrastructure
Pending Verification
$5,300,000 CJ est. value
Gulf Breeze, FL 32563

Oasis Resort and Escape Family Center
New Construction, Infrastructure - 30,000 SF
Pending Verification
$5,000,000 CJ est. value
Pensacola Beach, FL 32561

Locklin Lake - Upstream Stormwater Improvements - City of Milton
Infrastructure
Conception
$1,000,000 CJ est. value
Milton, FL 32570

Last Updated 08/12/2023 08:31 AM
Project Title

Bridge Repair/Rehabilitation - SR 8

Physical Address View project details and contacts
City, State (County) Bagdad, FL 32583   (Santa Rosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,139,310 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Santa Rosa Road Name: Bridge Repair/Rehabilitation Limits: 58002000 Project(s): 42359155201(*) Federal Aid No: N/A Total Roadway Length: 0.589 Miles Contract Days: 90 Total Bridge Length: 0.589 Miles Total Proposal Length: 1.178 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Description: The Improvements under this District Contract consist of replacing the WB approach slab and traffic railing on the east end of the bridge, and minor roadway reconstruction with milling, resurfacing, and pavement markings. Drainage improvements include replacement of shoulder gutter and shoulder gutter inlet tops that are impacted by TTCP operations. Other improvements include replacement of guardrail impacted by TTCP and replacement of the expansion joint adjacent to the new approach slab on SR 8 (I-10) over Blackwater River Bridge No. 580167 in Santa Rosa County. Pre-qualification is Required to Bid on This Project For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 002 Bridge Repair/Rehabilitation - SR 8

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents