Similar Projects
Pavement Milling, Hot Mix Asphalt Overlay, Ultra-Thin Bonded Wearing Course with Safety Improvement - Hampden and Hermon - Region 4
Infrastructure
Bidding
$2,000,000 est. value
Hampden, ME

2022 Resurfacing of City Streets
Infrastructure
Bidding
$300,000 est. value
Brewer, ME

Paving Replacement Project at Beech Hill School
Infrastructure
Post-Bid
Otis, ME 04605

Road Paving
Infrastructure
Post-Bid
Swans Island, ME

Roadwork Spring 2021
Results
Bernard, ME

Pavement Milling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements
Results
Old Town, ME

FY 2023 Paving Program
Infrastructure
Bidding
$200,000 est. value
Bangor, ME

Pavement 2021 Project
Infrastructure
Post-Bid
Brewer, ME

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course with Drainage and Safety Improvements
Results
Less than $4,403,000 est. value
Medway, ME

Paving
Infrastructure
Post-Bid
Medway, ME 04460

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course, Bridge Work, with Safety Improvements
Results
Less than $7,703,000 est. value
Carmel, Etna, Newport, Palmyra, Plymouth, ME

Levinson Center Paving Project
Infrastructure
Post-Bid
Bangor, ME 04401

Placement of Plant Mix Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, Drainage, Safety Improvements and Intersection Improvements
Results
$1,600,000 est. value
Hampden, Newburgh, ME

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

On Call Milling Machines and Grinders
Results

Last Updated 06/23/2022 11:20 AM
Project Title

Crack Sealing

Physical Address View project details and contacts
City, State (County) Amherst, Aurora, Clifton, Gouldsboro, Sullivan, ME (Hancock, Penobscot Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description: State Project 018995.45, WIN 18995.45. Location: In Hancock County: Priority 1 is located on US Route 1 beginning 0.13 of a mile north of Punkinville Road in Sullivan and extending east 8.01 miles to Gouldsboro. Priority 4 is located on Route 9 beginning in Amherst 0.24 of a mile east of Smith Road in Amherst and extending easterly 3.24 miles to 0.24 of a mile west of Richardson Road in Aurora. Priority 5 is located on Route 9 beginning in Aurora 0.24 of a mile west of Richardson Road and extending east 8.13 miles. In Hancock and Penobscot Counties: Priority 3 is located on Route 9 beginning in Clifton 0.12 of a mile west of Clifton - Amherst town line and extending east 1.94 miles.to Amherst. In Penobscot County: Priority 2 is located on Route 9 in Clifton 0.36 of a mile west of Old Stage Coach Road and extending east 2.40 miles. Outline ofWork: Crack Sealing and other incidental work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents