Similar Projects
Willamette Falls Locks (WFL) Seismic and Safety Upgrades
Renovation
Design
$5,000,000 to $10,000,000 est. value
West Linn, OR 97045

Bonneville Powerhouse I Ice & Trash Sluiceway Leaf Replacement
Renovation
Bidding
$700,000 est. value
Cascade Locks, OR 97014

John Day Dam Turbine Runner Replacement and Generator Rewind Project - Industry Site Visit
Renovation
Post-Bid
$500,000,000 est. value
Rufus, OR 97050

Cougar Butterfly Valve Replacement
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Blue River, OR 97413

Reservoir Replacement Project at Detroit Lake State Park
New Construction
Results
$475,000 est. value
Detroit, OR 97342

Fishhawk Lake Dam Spillway and Fish Passage Improvements
Renovation
Results
$3,500,000 to $3,900,000 est. value
Westport, OR 97016

McNary Lock & Dam - Stoplog Seals and Molds
Renovation
Post-Bid
Umatilla, OR 97882

Dam 1 Spillway Gates Replacement Project
Renovation
Results
Portland, OR

McNary Lock & Dam - Structural Steel Heat Straightening
Renovation
Post-Bid
Umatilla, OR 97882

Oregon Hatchery Research Center Diversion Dam Slab Extension
Addition
Results
$300,000 est. value
Alsea, OR 97324

John Day Dam Turbine Runner Replacement and Generator Rewind Project - 90% Review
Renovation, Term Contract
Post-Bid
$500,000,000 est. value
Rufus, OR 97050

Lebanon Dam Pit Interrogation System
New Construction
Results
$900,000 est. value
Lebanon, OR 97355

McNary Drainage, Unwatering, and Equalization System Rehab
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Umatilla, OR 97882

Mcnary Navigation Lock Downstream Gate Gudgeon Anchor Replacement
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Umatilla, OR 97882

Gate Replacement
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Oakridge, OR 97463

Last Updated 05/31/2022 12:14 AM
Project Title

Limber Jim Aquatic Organism Passage

Physical Address View project details and contacts
City, State (County) Baker City, OR 97814   (Wallowa County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Limber Jim Creek Aquatic Organism Passage project will replace an existing open bottom corrugated metal pipe with a pre-cast concrete bridge. This project will include excavating the bridge site, placing and installing the bridge, placing surface aggregate, installing bridge rail, and constructing a simulated stream. - Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents