Similar Projects
Steam Line Replacement Marquette to South Housing - General
Bidding
Less than $500,000 est. value
Prairie du Chien, WI

Lathrop Drive Utility Replacement - Phase II
Bidding
Less than $14,000,000 est. value
Madison, WI

Cold Water Fire Service Meters
Term Contract
Post-Bid
Milwaukee, WI 53202

Storm Main Repair
Post-Bid
Tomah, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4th Street and Lake Avenue Utility Relocations
Bidding
Racine, WI 53403

Steam Line Replacement Marquette to South Housing - MEP
Post-Bid
Less than $500,000 est. value
Prairie du Chien, WI

2020 Utility Replacements
New Construction, Renovation
Results
Sturgeon Bay, WI 54235

2021 Utility Construction - Hartzheim Drive
Bidding
Little Chute, WI 54130

Manhattan Drive Water Main Replacement
Post-Bid
$395,000 est. value
Menomonee Falls, WI 53051

County Line Road Sanitary Sewer and Water Main Conversion
Results
$1,800,000 to $2,100,000 est. value
Menomonee Falls, WI 53051

Evergreen Drive Utilities
Bidding
Little Chute, WI 54140

42-Inch Transmission Water Main Phase 2
Post-Bid
Less than $6,300,000 est. value
Racine, WI 53400

Division Street and Prospect Street Sanitary Sewer and Water Main Reconstruction
Results
Winneconne, WI 54986

Last Updated 04/13/2021 07:13 AM
Project Title

Lathrop Drive Utility Replacement - Phase II

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of upgrading underground utilities between Sterling Hall and Park Street along Lathrop Drive. Utilities being upgraded include: New cast-in-place walkable steam tunnel (approximately 125 feet), New steam box conduits (approximately 400 feet), chilled water supply and return lines (approximately 700 feet (each) ), signal and primary ductbanks (approximately 825 feet), water lines (approximately 1000 feet), sewer lines (approximately 700 feet).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents