Similar Projects
Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Modular Block Wall Units
Term Contract
Sub-Bidding
Pittsburgh, PA 15219

Precast Concrete Inlets and Risers
Alteration
Post-Bid
Carnegie, PA

Simi-Calcine Dolomite (AKDOLIT)
Term Contract
Post-Bid
Pittsburgh, PA 15219

Concrete Repairs at South Park Wave Pool III
Alteration
Results
Bethel Park, PA 15102

Renovation/Repair Sidewalks and Other Concrete Work
Term Contract, Infrastructure, Alteration
Results
Pittsburgh, PA

Harrison Hills VFD -Floor Slab Replacement
Alteration
Post-Bid
$400,000 est. value
Natrona Heights, PA 15065

Exterior Alterations for the Harrison Village Recreation Center (AMP 2)
Renovation
Results
$418,550 CJ est. value
McKeesport, PA 15132

Concrete Maintenance
Term Contract
Post-Bid
Pittsburgh, PA 15219

Borough Building Parking Lot Improvements Rebid
Infrastructure
Results
$714,634 CJ est. value
Wilkinsburg, PA 15221

Concrete Support Authority Wide
Term Contract
Post-Bid
Pittsburgh, PA 15219

District 1 Salt Storage Building II
Demolition, New Construction, Infrastructure
Results
$152,250 CJ est. value
Gibsonia, PA 15044

Town Center Improvements - Phase 1
Infrastructure, Renovation
Post-Bid
$435,387 CJ est. value
Oakdale, PA 15071

2023 Paving Project
Infrastructure
Results
$564,467 CJ est. value
Bellevue, PA 15202

Environmental Charter High School - New Building
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Pittsburgh, PA 15206

Last Updated 06/02/2023 05:04 PM
Project Title

2022 Sidewalk Improvements Program (Re-Bid)

Physical Address View project details and contacts
City, State (County) Scott Township, PA 15106   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $208,525 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

*Per Civil Engineering, all bids rejected, no plans for immediate re-bid. The scope of work includes the removal and replacement of approximately 3,900 square feet of concrete sidewalk, clearing and grubbing of debris in the path of the sidewalk, and all necessary appurtenances and restoration for said pedestrian improvement construction along Bower Hill Road and Ash Street. Pennsylvania prevailing wage rates apply. Proposals must be upon the forms furnished by the Township. The bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid, made payable to the Township of Scott. The Township reserves the right to reject any or all proposals and to waive any informalities in the bidding. No bid may be withdrawn for ninety (90) calendar days after the scheduled time for receipt of bids. Attention is directed to the fact that procurement is subject to all requirements of the Pennsylvania "Steel Products Procurement Act, Act No. 1978-3"; and for Contract value exceeding $25,000, the Pennsylvania Prevailing Wage Act (Act of 1961 PL. 987), and The Public Works Employment Verification Act (July 2012) apply. All bids rejected.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents