Similar Projects
Camden Baker Apartments
New Construction - 214,991 SF
Conception
Denver, CO 80223

Evans West
New Construction, Demolition - 715,000 SF
Conception
$160,000,000 est. value
Denver, CO 80204

4055 North Elati Street Mixed Use
New Construction - 67,476 SF
Design
Denver, CO 80110

4345 46th Street Apartments
New Construction - 123,880 SF
Design
$10,000,000 CJ est. value
Denver, CO 80212

Parterre
New Construction
Post-Bid
Thornton, CO 80602

Block 176
New Construction, Demolition - 767,123 SF
Post-Bid
Denver, CO 80202

Architectural Engineering Services-Overlook at Thornton Apartments
Addition
Results
Less than $16,000,000 est. value
Denver, Thornton, CO 80260

Construction Manager for Willow Park and Gateway Family Apartments
New Construction
Results
CO

The Collins / Brick Stone on Harmony
New Construction - 202,000 SF
Construction
$10,000,000 CJ est. value
Fort Collins, CO

Aspire Aprtments
New Construction - 93,283 SF
Construction
$61,000,000 est. value
Westminster, CO 80031

Steamboat Basecamp
Renovation - 46,397 SF
Pending Verification
Steamboat Springs, CO 80487

Kechter Farm Mixed-Use Townhomes
New Construction - 186,000 SF
Pending Verification
$10,000,000 CJ est. value
Fort Collins, CO 80528

Ridgewood Hills
New Construction
Conception
Fort Collins, CO 80525

Confluent Park Apartments
New Construction
Design
Salida, CO

Girard Apartments
New Construction - 21,213 SF
Post-Bid
$2,500,000 est. value
Aurora, CO 80231

Last Updated 06/21/2022 02:26 PM
Project Title

East Vail Multi Residential

Physical Address View project details and contacts
City, State (County) Vail, CO   (Eagle County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation.
Project Status Schematic Drawings, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a multi-residential development in Vail, Colorado. Design plans call for the construction of a 165-unit multi-residential development. Plans call for an affordable housing development of 165 apartments at a Vail ski resort. As of June 2022, the project was approved by the Town of Vail in October 2019, however, the town has recently condemned the land. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents