Similar Projects
Kroger #118-01 - Site Work Only
New Construction
Design
Spring, TX 77388

Annual Requirements Contract for Directional Boring Services and Drill Shafts
Results
$313,905 est. value
Arlington, TX

Relocation and Leveling of Portable Buildings and Ramps
Results
Dallas, TX

Wesco Office Building - Site Work Package
New Construction
Construction
Austin, TX 78735

Air Center Distribution Center Detention Pond
New Construction
Construction
Houston, TX 77000

Vintage Farms Subdivision Phase 2
Results
Less than $1,600,000 est. value
TX

The Grid Phase II Pad Sites
New Construction
Construction
Stafford, TX 77477

Arrowhead Farms Subdivision Phase 1
Results
Less than $1,700,000 est. value
Caldwell, TX 77836

Heb Parking Lot Expansion / Hike And Bike Trail
New Construction
Construction
Dallas, TX 75206

Core Drilling Services
Results
Fort Worth, TX 76133

O'Reilly Auto Parts Parking Lot Addition
New Construction
Construction
Sanger, TX 76266

Core Drilling Services
Results

Clements Ranch Phase 6 Excavation Improvements
New Construction
Construction
Forney, TX 75023

Clements Ranch Phase 5 Excavation Improvements
New Construction
Construction
Forney, TX 75023

Basketball Performance Facility
Construction
Nacogdoches, TX 75962

Last Updated 12/18/2019 11:25 AM
Project Title

Firearms Training Facility Site Improvements

Physical Address View project details and contacts
City, State (County) Sherman, TX 75090   (Grayson County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction and Installation of a 30’ x 30’ metal structure with one bath: 1. 30’ x 30’ x 10’ 2:12 metal building with two (2) 3’x3’ vinyl windows and two (2) 3’x7’ steel walk doors with dead bolt 2. All related dirt work 3. Concrete a) 900 sf concrete slab b) 3,500 PSI concrete c) 12”x18” grade beam d) #5 rebar (for beams) e) #3 rebar (on 18” centers each way) f) 6 mil vapor barrier 4. Insulation a) 1” closed cell spray foam insulation on roof and main building walls 5. Interior Framing a) One (1) 10’x10’x8’ enclosed bathroom b) One (1) 10’x10’x8’ storage area c) 2x4 studded walls w/ OSB wall covering d) Two (2) 3’x6’ 8” interior doors with hardware 6. Plumbing a) Rough in, top out, fixtures included b) Does not include connection to water line 7. Electrical a) Basic electrical package b) 110v plugs c) 8’ LED lighting for shop area d) 6” can lights in enclosed areas e) Does not include connection to utilities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents