Similar Projects
Roadway Pavement Restoration
Bidding
Clifton, NJ 07011

Maintenance Job Order Contracting (JOC) Infrastructure Repairs, North - 2020
Bidding
$5,000,000 to $10,000,000 est. value

2017 Community Development Block Grant 2017 Road Program
Post-Bid
Wanaque, NJ

Red Twig Trail Road Improvements
Post-Bid
$650,000 to $700,000 est. value
Bloomingdale, NJ 07403

First Street Road Improvement from Monroe Street to Passaic Street Passaic
Results
Passaic, NJ

Mcbride Avenue Streetscape Phase 3
Results
Little Falls, NJ

Erskine Road and Lakeview Avenue Roadway and Drainage Improvement Project, Phase 1 and 2
Post-Bid
Ringwood, NJ 07456

Maintenance Resurfacing Contract, North - 2019; Various Locations; Bergen, Essex, Hudson, Morris, Passaic, Sussex, Union and Warren Counties
Results
$5,000,001 to $10,000,000 est. value

Mcbride Avenue Streetscape Phase 4
Post-Bid
Woodland Park, NJ 07424

Monroe Street and Spring Street Road Improvements
Results
Passaic, NJ

Asphalt Paving at Five Lukoil Service Stations
Renovation
Post-Bid

Pavement Preservation Contract North
Results
Less than $5,000,000 est. value

Improvements to Donato Drive
Post-Bid
Little Falls, NJ 07424

Immediate and Scheduled Asphalt Repairs
Term Contract
Results
Less than $2,000,000 est. value
Woodbridge, NJ 07095

2018 Road Program
Post-Bid
Totowa, NJ 07512

Last Updated 08/12/2019 11:25 AM
Project Title

2018 HUD-CD Street Improvements

Physical Address View project details and contacts
City, State (County) Clifton, NJ   (Passaic County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of sanitary sewers as necessary, construction of ADA ramps, milling and resurfacing the roadway, restriping, replacing signage and planting trees on various streets throughout the City of Clifton
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents