Last Updated | 09/15/2023 04:03 PM |
Project Title | Site Drainage and Roof Replacement Street Frances Xavier Cabrini Parish |
Physical Address | View project details and contacts |
City, State (County) | Vassar, MI 48768 (Tuscola County) |
Category(s) | Heavy and Highway, Religious/Funeral, Sewer and Water |
Sub-Category(s) | Religious Facility, Site Development, Water Lines |
Contracting Method | Bids by Invitation |
Project Status | All Sub-Bids Received, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $426,571 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of September 15, 2023, a general contractor has not been awarded and the project has been delayed. Roof Replacement remove existing asphalt shingled roofing and install new standing seam metal roofing, and gutters with downspouts on Church and on Parrish. Exterior Insulation Finishing System Replacement - Remove existing EIFS and apply new EIFS with new drainage channels and flashing details over a new liquid applied water-resistive barrier. Site Drainage Improvements - install drainage tile and catch basins around building. A tabulation of bids will be provided to all registered bidders that submitted a bid. Each bid proposal shall be accompanied by the required bid form and all documents per the instructions to bidders available in the bidding documents. The Owner reserves the right to waive any informality in any bid, to reject any or all bids, or accept any bid which is considered most favorable to the Owner, project duration will be considered. The bids will be opened privately and tabulated within 5 business days. A tabulation of bids will be provided to all registered bidders that submitted a bid. Each bid proposal shall be accompanied by the required bid form and all documents per the instructions to bidders available in the bidding documents. The Owner reserves the right to waive any informality in any bid, to reject any or all bids, or accept any bid which is considered most favorable to the Owner, project duration will be considered. Bid Result Sitework - Cooper Excavating - $48,750.00 Roofing - Cork Pine Builders - $278,821.00 EIFS - Booms Construction - $99,000.00 |
||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, 13,957 SF.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |