Similar Projects
Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Restroom and Shower Facility Solutions
New Construction, Term Contract
Bidding

WAPA Facilities / Small Construction IDIQ
Post-Bid

Open Air Structures and Accessory or Utility Buildings with Related Equipment and Services
Post-Bid

Oxbow Nature Center
New Construction
Results
Byron, MN 55920

USPS IQ JOC Minnesota
Renovation
Results

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Century High School Swimming Pool and Locker Room Addition BP 1
Addition, Alteration - 25,863 SF
Results
$2,500,000 est. value
Rochester, MN 55906

Facility Assesment and Planning with Related Services
Term Contract
Post-Bid

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

South Carolina Construction IDIQ
New Construction, Renovation, Addition
Post-Bid
$250,000 to $3,000,000 est. value

Last Updated 08/05/2021 02:16 PM
Project Title

Regional Public Safety Training Center Restroom and Shower Building

Physical Address View project details and contacts
City, State (County) Rochester, MN 55904   (Olmsted County)
Category(s) Entertainment/Recreation, Government/Public
Sub-Category(s) Misc. Buildings, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Misc. Buildings, New Construction, Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents