Similar Projects
Poe Gate 1 Blasting & Coating
Design
$1,000,000 to $5,000,000 est. value
Sault Sainte Marie, MI 49783

Barton, Argo, and Superior Gate Repair
Bidding
Ann Arbor, MI

Fence Replacement
Bidding
Westland, MI

Ferndale High School Gym Sound System and Exterior Gates
Post-Bid
Ferndale, MI

Moores Park Tainter Gate Trunnion Pin Replacement
Post-Bid
Lansing, MI

Temporary Bus Parking Lots - Fencing
Results
Less than $42,450 est. value
Rochester, MI

Sliding Security Gate and Controls Replacement, East and West Administration Buildings Chippewa Correctional Facility
Results
Kincheloe, MI

Fence Replacement
Bidding
Westland, MI

Michigan State Police Grant - Bid Package 22
Post-Bid
Plymouth, MI

Z--655-15-108 Medical Center Security System
Results
Saginaw, MI 48602

Ann J Kellogg Elementary School Mechanical Upgrades
Bidding
Battle Creek, MI 49037

FMO Gate Maintenance
Post-Bid
Pontiac, MI

Construct Taxiway Fence at Battle Creek ANGB
Results
$25,000 to $100,000 est. value
Battle Creek, MI 49037

Sawyer WWTP Water Tank Perimeter Fence
Bidding
Marquette, MI

Fencing Maintenance and Repair
Post-Bid
Canton Township, MI

Last Updated 12/15/2020 03:45 PM
Project Title

Y1PZ--Parking Structure Fall Protection 506-20-105

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48105   (Washtenaw County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include: The Contractor shall replace the interior and exterior spandrel beam railing with fall deterrent fence on levels C, D and E of the West Parking Structure located at the VA Ann Arbor Healthcare System, 2215 Fuller Road, Ann Arbor, Michigan. The Contractor shall remove the existing railing, repair precast concrete spandrel, fabricate fall deterrent fence and install to meet VA standards and governing codes. According to the VA Parking Design Manual, the top of the fall deterrent fence must be 96 from the parking surface. The fall deterrent fence on level E shall be a continuous barrier across columns and walls where existing railings are not present.

Details

Division 09 - Finishes.
Division 11 - Equipment, Maintenance Equipment, Facility Fall Protection.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents