Similar Projects
Bridge Rehabilitation
New Construction
Results
$500,000 to $750,000 est. value
MO

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Route I-70 - Concrete Pavement Repair at Various Locations in the Central District
Infrastructure
Results
$250,000 to $500,000 est. value

I-44 - Asphalt Pavement Repair
Infrastructure
Results
$500,000 to $750,000 est. value

I-70 - Asphalt Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

I-44 - Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

2022 Roadway Improvements
Infrastructure
Post-Bid
$700,000 est. value
Boonville, MO

Bridge Number 1540003 Replacement on Oakland Lane Over Tributary to Petite Saline Creek
Demolition, New Construction, Infrastructure
Results
$246,758 CJ est. value
Pilot Grove, MO 65276

Bridge Number 1540003 Replacement on Oakland Lane Over Tributary to Petite Saline Creek
Demolition, New Construction, Infrastructure
Results
$246,758 CJ est. value
Pilot Grove, MO 65276

Bridge Number 1540003 Replacement on Oakland Lane Over Tributary to Petite Saline Creek
Demolition, New Construction, Infrastructure
Results
$246,758 CJ est. value
Pilot Grove, MO 65276

Overton Chute Rehabilitation
Infrastructure
Results
$2,287,808 CJ est. value
Boonville, MO 65233

Overton Chute Rehabilitation
Infrastructure
Results
$2,287,808 CJ est. value
Boonville, MO 65233

Roadway Improvements 2023
Infrastructure
Results
$164,811 CJ est. value
Boonville, MO 65233

Roadway Improvements 2023
Infrastructure
Results
$164,811 CJ est. value
Boonville, MO 65233

Last Updated 06/13/2023 05:38 AM
Project Title

Bridge Rehabilitation

Physical Address View project details and contacts
City, State (County) Boonville, MO 65233   (Cooper County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $172,455 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J5S3465 Route U Cooper County. Bridge rehabilitation over Petite Saline Creek near Boonville, the total length of improvement being 0.0947 miles. Range: $500K to $750K Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve-Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as Obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. MODOT - D04 - Bridge Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents