Similar Projects
Reported | 07/29/2022 12:00 AM |
Project Title | Engineering Assessment of Park Reservoir |
Physical Address | View project details and contacts |
City, State (County) | Palo Alto, CA (Santa Clara County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected July 2023, |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Services The City of Palo Alto Is Seeking Proposals From Qualified Firms to Provide Engineering Assessments and Inspections of the Conditions of Park Reservoir With the Focus on the Structural Elements of the Foundation, Tank Base, Tank Shell, and Roof of the Park for the Engineering Assessment of Park Reservoir Project. The Required Services and Performance Conditions Are Described in the Scope of Services. . Exhibit a - Park Reservoir Report of Findings From the Diving Operations 2. Exhibit B - 2009 Cleaning and Inspections 3. Exhibit C - Product Data and Application Requirements for 1992 Recoating and Exterior Repainting of Park Water Storage Reservoir 4. Exhibit D - 1964 Park Reservoir Control Valve Vault 5. Exhibit E - Additional Geotechnical Investigation Structural Services During the Assessment Phase and Site-specific Seismic Hazard Characterization. 6. Exhibit F - Palo Alto Reservoir Tank Rehabilitation Needs Assessment Tech. Memo 7. Exhibit G - 2019 as-builts 4 Tanks and 3 Turnouts Drawings 8. Exhibit H - 2021 Visual Inspection Photos 9. Exhibit I - Coating and Seismic Upgrades Draft Alternatives Analysis Report 10. Exhibit J - Draft Design Criteria Memorandum Coating and Seismic Upgrade 11. Exhibit K - Draft Condition Assessment for Coating and Seismic Upgrade 12. Exhibit L - Villalobos Study of Park Reservoir Other Details Available Records The Following Documents May Be Requested From the City of Palo Alto's Utility Department's Water, Gas, and Wastewater Engineering Asset Management Group. Respondents Are Encouraged to Request and Review the Available Records. The Consultant Will Be Encouraged to Review and Incorporate These Records Into the Final Design. Respondents Shall Request a Copy of the City's Utility Map Request Form and Submit the Completed Utility Map Request Form to Utilitymaprequest@cityofpaloalto.org. Include "rfp185269 - Records for Park Reservoir Engineering Assessment" in the Title of the Subject Line. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |