Similar Projects
Plumbing Systems Maintenance, Equipment, Parts and Services
Bidding
Seguin, TX 78155

Plumbing Services
Term Contract
Post-Bid
Del Valle, TX

Sanitary Sewer Replacement
Infrastructure
Post-Bid
Fort Worth, TX 76102

Automated Meter Reading System
Infrastructure
Results
$417,568 CJ est. value
Gun Barrel City, TX 75156

Plumbing System Maintenance and Related Services
Term Contract
Results
Los Fresnos, TX

Matagorda Ship Channel, Texas, Matagorda Peninsula to Point Comfort, Pipeline Dredging
Term Contract
Post-Bid
$50,000,000 CJ est. value
Galveston, TX 77553

Plumbing Services
Alteration
Results
Fort Worth, TX

Mechanical, Electrical and Plumbing MEP (JOC)
Alteration
Post-Bid
Houston, TX

Plumbing Maintenance and Supplies for the 2021-2022 School Year
Term Contract
Results
Tuscola, TX

Phillips Event Center Plumbing
Alteration
Post-Bid
Bryan, TX 77802

Job Order Contracts
Alteration
Results
Wichita Falls, TX

Mechanical Electrical and Plumbing Service
Term Contract
Post-Bid
Houston, TX

Plumbing Services and Materials
Alteration
Results
$300,000 est. value
El Paso, TX

Plumbing Services
Term Contract
Post-Bid
Dallas, TX

Fox Fine Arts Center - Piping Replacement Project
Alteration
Results
El Paso, TX 79902

Last Updated 04/07/2023 03:07 PM
Project Title

Purchase of Lift Station 20 Pumps

Physical Address View project details and contacts
City, State (County) Port Isabel, TX 78578   (Cameron County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Section Covers Furnishing Lift Station 20 Pumps. Laguna Madre Water District Has the Need to Replace Pumps With New, Unused Ones. Equipment Furnished in This Specification Shall Be Fabricated and Assembled in Full Conformity With This Specification. Pump Shall Be Furnished Complete With All Supports; All Mechanical Equipment Required for Proper Operation, Including Complete Drive Units; All Steel, Iron, and Other Metal Construction Specified Herein; and All Additional Materials or Fabrication as Required by the Suppliers' Design. All Equipment Included in This Section Shall Be Furnished by a Single Supplier Who Shall Be Responsible for the Design, Coordination, and the Satisfactory Operation of the Part.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents