Similar Projects
Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 est. value
Kansas City, MO 64121

Mace Road Sidewalks - City of Kansas City
Infrastructure
Conception
$260,000 est. value
Kansas City, MO 64152

Museum Tower / Kansas City
New Construction, Infrastructure - 293,400 SF
Design
Less than $116,200,000 est. value
Kansas City, MO 64111

River Market Mixed-Use Development
New Construction, Infrastructure - 8,500 SF
Design
$50,000,000 CJ est. value
Kansas City, MO 64106

East 31st Street Sidewalks (Both Sides) - Benton Boulvard to Agnes Avenue - SLBE
Infrastructure
Bidding
$180,000 CJ est. value
Kansas City, MO 64128

East 31st Street Sidewalks (Both Sides) - Benton Boulvard to Agnes Avenue - SLBE
Infrastructure
Bidding
$180,000 CJ est. value
Kansas City, MO 64128

McBee's Coffee 'N Carwash / Lee's Summit
New Construction, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Lees Summit, MO 64082

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Cathodic Protection Program FY21
Infrastructure
Post-Bid
Lees Summit, MO

East Side of Ward Parkway - W 83rd Street to W 84th Street
Results
Less than $110,995 est. value
Kansas City, MO 64114

SLBE 73rd St Jefferson to Pennsylvania Ave
Renovation
Results
Less than $49,275 est. value
MO

I-670 Deck- City of Kansas City
New Construction, Infrastructure
Pending Verification
$160,000,000 CJ est. value
Kansas City, MO 64108

I-670 Deck- City of Kansas City
New Construction, Infrastructure
Pending Verification
$160,000,000 CJ est. value
Kansas City, MO 64108

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 est. value
Kansas City, MO 64134

Defeo Apartment Tower Development
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Kansas City, MO 64106

Last Updated 07/29/2022 03:35 AM
Project Title

RFP Engineering - 24 Highway Complete Streets Phase 3

Physical Address View project details and contacts
City, State (County) Independence, MO 64050   (Jackson County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Submission of a proposal shall be deemed a firm offer and is not revocable within 120 days after response deadline. Deadline for questions August 10, 2022, 4:00 p.m. local time Notification of award October 24, 2022 Project to be advertised in Summer 2024 for a Summer 2024 construction. The City of Independence, Municipal Services Department, requests proposals from qualified consulting engineering firms to prepare preliminary engineering plans, right-of-way plans, legal descriptions, final plans, bid documents, and provide technical support services during construction for the 24 Highway Complete Streets Phase 3, a MoDOT cost-share project. 24 Highway Complete Streets Phase 3 from Wilson Rd to 400 feet West of Sterling Ave as a part of J4S3405 project from 500' West of River Blvd to Wilson Rd. The conceptual design and cost estimate were completed and found that the total cost estimate was more than $2 Million over the budget. Due to safety funds deadline, MoDOT staff and City staff decided to separate this project into two phases. Phase 2 - from 400 feet West of Sterling to 500 feet West of River Blvd. Phase 3 - Wilson Rd to 400 feet West of Sterling. The City submitted and received approval for a MoDOT cost share for Phase 3 project. This project will provide for the improvement of 0.603 miles of Route 24 in City of Independence from Wilson Road to 400 feet West of Sterling Avenue. The corridor improvements include offset intersections modification, sidewalks, shared use path, asphalt pavement, upgrading drainage, adding lighting, and signal replacements. The consultant will be responsible for additional survey tasks required to provide professional, technical and all other things necessary for preparing preliminary plan, right of way plan, final plan and PS&E package in time for Summer 2024 letting. In addition to the final design activities the consultant will be responsible for submitting RER at each project milestone, providing displays/layouts and information for utitlity clearance, right-of-way acquisition and a public meeting. The consultant will provide project support during the construction phase to help answer questions or evaluate value engineering proposals. The method of contractor selection has not been determined at this time. MODOT - RFP Engineering - 24 Highway Complete Streets Phase 3

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents