Similar Projects
Global Learning Charter Public School Renovations
Renovation
Conception
New Bedford, MA 02746

David Prouty High School
Renovation, Addition
Conception
$30,000,000 to $50,000,000 est. value
Spencer, MA 01562

Sparhawk Academy
New Construction - 8,000 SF
Design
Millis, MA

Tyngsborough Middle School
Addition
Design
$81,000,000 est. value
Tyngsborough, MA 01879

Josiah Quincy Upper School Project
Renovation
Bidding
$146,000,000 est. value
Boston, MA 02110

Watkins Field Building - Gardner High School - GC Bid
New Construction - 1,283 SF
Bidding
$300,000 est. value
Gardner, MA 01440

Josiah Quincy Upper School Swing Space Project - Filed Sub Bids
Post-Bid
$1,044,030 est. value
Boston, MA

Sale and Development of the Former Rogers Elementary School
Post-Bid
Fairhaven, MA 02719

Lowell High School - Filed Sub Bids
Renovation, Addition
Results
$270,000,000 est. value
Lowell, MA

Sharon High School - Filed Sub Bids
New Construction - 240,204 SF
Results
$125,351,000 est. value
Sharon, MA 02067

Argosy Collegiate Charter School
Addition - 58,219 SF
Construction
Less than $3,000,000 est. value
Fall River, MA 02721

St. John's Preparatory School Entrance
Renovation, Addition
Construction
Shrewsbury, MA

The Gilder Center
New Construction - 42,000 SF
Pending Verification
$30,000,000 est. value
Gill, MA 01354

Derby Academy Expansion
Addition
Pending Verification
$93,500 est. value
Hingham, MA 02043

Dr. Albert B. Consentino Middle School
Renovation, Addition
Conception
Haverhill, MA 01832

Last Updated 06/09/2022 01:43 AM
Project Title

Existing Building Upgrades

Physical Address View project details and contacts
City, State (County) West Springfield, MA   (Hampden County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. The work includes: removal and replacement of the existing boiler, installation of a new emergency generator, installation of new classroom HVAC ductless split systems, and related upgrades to the existing building electrical system upgrades, all in accordance with requirements of the Contract Documents

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents