Similar Projects
Camp Burton Road Basin Utilities Camp Burton Lift Station, Force Main, and Gravity Sewer
New Construction, Infrastructure
Bidding
$19,000,000 est. value
Greensboro, NC

Olive Branch Pump Station Renovations
Renovation
Bidding
NC

Sewer Pump Station No. 1 Improvements
Post-Bid
$524,959 est. value
Walnut Creek, NC 27534

Poplin Road Pump Station Interim Improvements - Design Build Contract
Post-Bid
Monroe, NC 28112

Booster Pump Stations #1 and #2 Rehabilitation Project
Results
Troy, NC 27371

Frances Haven and Farmington Pump Station Decommissioning
Results
Less than $500,000 est. value
Harrisburg, NC 28075

North Belmont Booster Pump Station
Renovation
Bidding
Belmont, NC

French Broad River Intake Pump Station Project
Post-Bid
$10,000,000 to $15,000,000 est. value
Hendersonville, NC 28792

Wastewater Pump Station and Sewer System Improvements
Results
Grifton, NC 28530

Dana Drive Pump Station Flood Mitigation Improvements
Renovation
Bidding
Laurinburg, NC

Highway 75 Booster Pump Replacement
Term Contract
Post-Bid
Monroe, NC 28112

Lift Station Pump
Results
Greensboro, NC 27401

Juniper Pump Station Renovation and Wastewater Treatment Plant Removal 2
Renovation
Bidding
Bermuda Run, NC

Waxhaw Gravity Interceptor, Pump Station and Force Main
Post-Bid
$6,000,000 to $7,000,000 est. value
Monroe, NC

Celeste Circle Lift Station Improvements
Results
Less than $171,940 est. value
Durham, NC 27701

Last Updated 03/16/2022 03:28 PM
Project Title

Mulberry Park Pump Station

Physical Address View project details and contacts
City, State (County) Shallotte, NC 28459   (Brunswick County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all the materials, tools, labor and equipment to construct approximately 300 LF of PVC Force main, 1 - 10 ft diameter wetwell precast polymer concrete with all related hardware, one valve vault, duplex solids handling 50 Hp nonclog pumps with control panels, and backup emergency 175 kW generator, and all miscellaneous appurtenances for a complete and functional project. All project construction shall be according to plans, specifications and contract documents.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents