Similar Projects
SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Indefinite Delivery-Indefinite Quantity Construction
New Construction
Bidding

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Air Force Contract Augmentation Program (AFCAP) V
Results

Indefinite Quantity Construction Contract - East Central and Southwest Florida
Results
$2,000,000 est. value

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

IDIQ Multiple Award Task Order Contracts for Horizontal Construction, Renovation, Repair, and Incidental Design In Alabama, Florida, Mississippi, and Georgia
New Construction, Renovation
Post-Bid
$100,000 to $250,000 est. value

Z--Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity, Firm-Fixed Price, Roofing Multiple Award Construction Contract for the Florida Panhandle Area of Operation
Results
$150,000 to $6,000,000 est. value

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Post-Bid

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

USPS IQ/JOC Solicitation for State of Florida
Results
$10,000 to $20,000,000 est. value

Sources Sought for Job Opportunity Construction Contracts
New Construction
Post-Bid
$2,000 est. value

Last Updated 11/04/2021 12:54 PM
Project Title

County Emergency Operations Center Retrofit

Physical Address View project details and contacts
City, State (County) Lake City, FL   (Columbia County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Construction Documents, Seeking Funding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The design of the CEOC shall be capable of withstanding wind loads in accordance with the hurricane provisions of ICC 500-2014. The minimum wind design shall include: Design Wind Speed = 160 miles per hour (3 second gust) Exposure Category = C Wind Directionality Factor, Kd = 1.00 The construction documents shall be titled “Columbia County Emergency Operations Center, 2020.” 2. The structural engineer of record shall include a statement in the construction documents certifying to the best of their knowledge and belief the CEOC was designed to withstand wind loads according to ICC 500-2014 and ASCE/SE17-(include publication year). 3. The CEOC shall resist penetration by large windborne debris impact. At a minimum the CEOC envelope (e.g., walls, windows, doors, louvres, roofs, skylights and hatches) shall meet the hurricane provisions of ICC 500-2014, or similar performance as approved by the Division. Impact-protective systems or products that meet 200 miles per hour or greater ICC 500-2014 tornado shelter design wind speed missile criteria are acceptable. 4. The minimum floor elevation of the CEOC shall be modified from ICC 500-2014 in accordance with the following: the lowest floor used for the CEOC shall be elevated to or above the higher of the elevations determined by: 1. 100-year (one percent annual chance) base flood elevation plus three (3) feet; 2. 500-year (0.2 percent annual chance) flood elevation (if determined) plus two (2) feet; and 3. Elevation required by the AHJ (authority having jurisdiction) for the proposed location. If a proposed location is not selected for the future CEOC during the planning and design period of performance, the lowest floor elevation determination outlined in this Section shall be incorporated into the construction documents. 5. The critical support system functional period of the CEOC shall be modified from ICC 500-2014 in accordance with the following: critical support systems shall be designed to remain functional at full emergency operations center occupant load for a minimum of 72-hours. Critical support systems shall not be solely reliant upon off-site services and utilities (e.g. water, natural gas fuel, electricity).

Details

20,000 SF - Fire/Police Station, Renovation, Misc. Buildings, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire-Extinguishing Systems, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents